Component redundancy allocation in optimal cost preventive maintenance scheduling
نویسندگان
چکیده
This work presents a methodology to assess maintenance teams in the determination of the degree of redundancy that an active component must have in order to minimize its system life-cycle cost and in the definition of the corresponding maintenance plan schedule. The minimal required data are three average costs and one reliability function. It is useful in a system’s design phase, since in this situation data is usually scarce or inaccurate, but can also be applied in the exploration phase. It is an adaptation of the classical Optimal Age Replacement method combined with a redundancy allocation problem. A set of simple illustrative examples covering a variety of operating conditions is presented, demonstrating quantitatively the applicability to a range of maintenance optimization decisions.
منابع مشابه
An Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems
General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance cost. The cost function of a maintenance policy was minimized under given availability constraint. On the other hand, in order to ensure appropriate reliability and availability, the development of the optimal maintenanc...
متن کاملOptimizing the preventive maintenance scheduling by genetic algorithm based on cost and reliability in National Iranian Drilling Company
The present research aims at predicting the required activities for preventive maintenance in terms of equipment optimal cost and reliability. The research sample includes all offshore drilling equipment of FATH 59 Derrick Site affiliated with National Iranian Drilling Company. Regarding the method, the research uses a field methodology and in terms of its objectives, it is classified as an app...
متن کاملTechnical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study
The conventional method towards deriving schedule for a fleet of ships to minimize cost alone has the short-coming of not addressing the problem of operation revenue losses associated with delays during maintenance at ships dockyards. In this paper, a preventive maintenance schedule for a fleet of ships that incorporates op-portunity cost is presented. The idea is to assign a penalty cost to al...
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...
متن کاملReliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants
Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JORS
دوره 66 شماره
صفحات -
تاریخ انتشار 2015