Applying Genetic Algorithm Techniques for Time-cost Optimization
نویسندگان
چکیده
Completing a construction project with the least time and cost is critical in a competitive environment. However, shortening the duration of any construction activity usually requires the engagement of additional labour and plant or the adoption of alternative construction techniques, and these usually add extra cost liabilities to the contractor. To minimise the total costs associated with schedule compression, contractors are often urged to establish the optimal time-cost relationships for construction activities when planning decisions are made. Several analytical models have been developed for time-cost optimisation. Despite that, difficulties are still being encountered in construction Time-Cost Optimisation (TCO), as there is a lack of unique solutions for integrating constraints associated with the time and cost requirements. Being a powerful tool to locate the global optimum (rather than local optimum), the Genetic Algorithms (GA) could be used to establish the fitness of solutions by evaluating the objective function and its constraints. In this paper, the analytical power of the GA is compared with other techniques proposed for TCO. The results indicate that the GA techniques could generate the most optimal outcome for construction TCO, especially when the project is large and/or complex.
منابع مشابه
A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملMULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-SAFETY USING GENETIC ALGORITHM
Safety risk management has a considerable effect on disproportionate injury rate of construction industry, project cost and both labor and public morale. On the other hand time-cost optimization (TCO) may earn a big profit for project stakeholders. This paper has addressed these issues to present a multi-objective optimization model to simultaneously optimize total time, total cost and overall ...
متن کاملOPTIMAL OPERATORS OF GENETIC ALGORITHM IN OPTIMIZING SEGMENTAL PRECAST CONCRETE BRIDGES SUPERSTRUCTURE
Bridges constitute an expensive segment of construction projects; the optimization of their designs will affect their high cost. Segmental precast concrete bridges are one of the most commonly serviced bridges built for mid and long spans. Genetic algorithm is one of the most widely applied meta-heuristic algorithms due to its ability in optimizing cost. Next to providing cost optimization of t...
متن کاملResearch of Blind Signals Separation with Genetic Algorithm and Particle Swarm Optimization Based on Mutual Information
Blind source separation technique separates mixed signals blindly without any information on the mixing system. In this paper, we have used two evolutionary algorithms, namely, genetic algorithm and particle swarm optimization for blind source separation. In these techniques a novel fitness function that is based on the mutual information and high order statistics is proposed. In order to evalu...
متن کاملResearch of Blind Signals Separation with Genetic Algorithm and Particle Swarm Optimization Based on Mutual Information
Blind source separation technique separates mixed signals blindly without any information on the mixing system. In this paper, we have used two evolutionary algorithms, namely, genetic algorithm and particle swarm optimization for blind source separation. In these techniques a novel fitness function that is based on the mutual information and high order statistics is proposed. In order to evalu...
متن کاملGenetic Algorithm-Based Optimization Approach for an Uncapacitated Single Allocation P-hub Center Problem with more realistic cost structure
A p-hub center network design problem is definition of some nodes as hubs and allocation of non-hub nodes to them wherein the maximum travel times between any pair of nodes is minimized. The distinctive feature of this study is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of considering costs as a linear function of distance, for the first...
متن کامل