Designing and modelling Havana’s future bus rapid transit
نویسنده
چکیده
(2015). Designing and modelling Havana's future bus rapid transit. Copyright and Moral Rights for the articles on this site are retained by the individual authors and/or other copyright owners. For more information on Open Research Online's data policy on reuse of materials please consult the policies page. 1 2 A single bus route in Havana's bus system is modelled from the current position to a modernised bus rapid transit (BRT). The system is based on an expert-led visioning process and Cuba's official planning documents, which define the high-level design criteria and their objectives. Building on the experiences of BRT systems that operate in other Latin American cities, a conceptual design for Havana's BRT system is defined in terms of the key institutional, technical and financial frameworks, and physical criteria that need to be considered. Based on the application of the conceptual design for Havana's BRT, a model for a single BRT route was constructed and modelled for emissions and capacity. The current situation and a future BRT scenario are modelled using a single bus route. The scenarios demonstrate that the current bus route with a BRT system can lead to lower overall emissions. The model suggests that if properly designed, Havana's BRT system has a realistic potential for providing, in a cost-efficient manner, the improvements in accessibility, employment generation, fuel efficiency and air quality required for achieving Havana's sustainable transport vision. The study finds critical factors, including the finance and business operating model, capability and planning.
منابع مشابه
Environmental impact assessment of bus rapid transit (BRT) in the Metropolitan City of Tehran
Bus rapid transit is an innovative, high capacity, lower cost public transit solution in metropolitan cities. Idea is to dedicate lanes for quick and efficient transport of passengers to their destinations. In the present investigation the environmental impact assessment of bus rapid transit in Tehran metropolitan city is brought out. For this purpose bus rapid transit Lane No. 10 is investiga...
متن کاملAvailability and Accessibility Assessment of Public Transit System in Jaipur City
Majority of the million plus cities in India are facing serious problems of traffic congestion and pollution due to the unprecedented and rapid pace of urbanization in last decade. City planners are providing solution to these twin problems by developing Mass Rapid Transit System including Metro and BRT in many Indian Metropolitan cities. The availability of transit network and pedestrian acces...
متن کاملEvaluating Bus Rapid Transit (BRT) line three in Tehran with international standards and providing solutions to improve it
The bus system in a high-speed public transportation systems are equipped with modern technology that due to accuracy, speed and flexibility have been considered as one of the improvement solutions in Tehran's public transport system. In this article the performance of BRT line three of Tehran has been evaluated based on the established standard in 2013, developed by the Institute for Developme...
متن کاملMulti-perspective Decision Support System for Hierarchical Bus Transportation Network Design: Tehran Case Study
In this paper, a multi-perspective decision support system (MP-DSS) to design hierarchical public transportation network is developed. Since this problem depends on different perspectives, MP-DSS consists of two sub-systems with macro and micro sub-systems based on travel information, land use and expert knowledge. In the micro sub-system, two sub-modules are developed considering o...
متن کاملTransit Signal Priority: Proposing a Novel Algorithm to Decrease Delay and Environmental Impacts in BRT Route Intersections
Intersections are considered as the most critical parts of the bus rapid transit (BRT) system. Transit signal priority is one of the efficient solutions to reduce BRT fleet delays at intersections. The aim of this study is to propose a new algorithm to decrease the BRT fleet delays at actuated intersections, while reducing the negative impacts on different approaches. The adaptive strategy is a...
متن کامل