Optimum workforce scheduling under the (14, 21) days-off timetable
نویسنده
چکیده
An efficient optimum solution is presented for a real-life employee daysoff scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number of workers. The secondary objective is to reduce transportation cost by minimizing the number of active days-off patterns. The solution technique utilizes the dual LP solution to determine the minimum number of workers and feasible days-off assignments, without using linear or integer programming. The simple solution technique eliminates the need to use integer programming for this particular scheduling problem.
منابع مشابه
Four-Day Workweek Scheduling with Two or Three Consecutive Days Off
A four-day workweek days-off scheduling problem is considered. Out of the three days off per week for each employee, either two or three days must be consecutive. An optimization algorithm is presented which starts by utilizing the problem’s special structure to determine the minimum workforce size. Subsequently, workers are assigned to different days-off work patterns in order to minimize eith...
متن کاملTrain Scheduling Problem - Phase I: A General Simulation Modeling Framework
One of the important problems in management of railway systems is train scheduling problem. This is the problem of determining a timetable for a set of trains that do not violate infrastructure capacities and satisfies some operational constraints. In this study, a feasible timetable generator framework for stochastic simulation modeling is developed. The objective is to obtain a feasible tr...
متن کاملSolving Multi-Activity Personalized Shift Scheduling Problems with a Hybrid Heuristic
This paper addresses a multi-activity shift scheduling problem in a continuous and flexible environment including a heterogeneous workforce. Given days-off schedules associated with each employee, our objective is to construct and assign admissible multiactivity shifts to employees on their work days in a way that minimizes under-staffing and over-staffing with a restricted budget on workforce ...
متن کاملMin Conflicts Based Heuristics for Rotating Workforce Scheduling Problem
Workforce scheduling problems are typical constraint satisfaction problems in which different constraints must be fulfilled, like needed workforce per day, forbidden sequences of shifts, length of work and days-off blocks etc. There are two main variants of workforce schedules: rotating (or cyclic) workforce schedules and non-cyclic workforce schedules. In a rotating workforce schedule all empl...
متن کاملDynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness
This paper aims to develop a multi-objective model for scheduling cargo trains faced by the costs of tardiness and earliness, time limitations, queue priority and limited station lines. Based upon the Islamic Republic of Iran Railway Corporation (IRIRC) regulations, passenger trains enjoy priority over other trains for departure. Therefore, the timetable of cargo trains must be determined based...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JAMDS
دوره 6 شماره
صفحات -
تاریخ انتشار 2002