Solving the flight perturbation problem with meta heuristics

نویسنده

  • Tobias Andersson
چکیده

When there is a perturbation in a carefully constructed aircraft schedule, e.g. an aircraft breakdown, it is important to minimize the negative consequences of this disturbance. Here, a tabu search and a simulated annealing approach to the flight perturbation problem are presented. The heuristics use a tree-search algorithm to find new schedules for the aircraft, and utilize a path relinking strategy to explore paths between structurally different solutions. The computational results indicate that the solution strategies, especially the tabu search, can be successfully used to solve the flight perturbation problem.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

متن کامل

Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing

This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...

متن کامل

Bi-objective Build-to-order Supply Chain Problem with Customer Utility

Taking into account competitive markets, manufacturers attend more customer’s personalization. Accordingly, build-to-order systems have been given more attention in recent years. In these systems, the customer is a very important asset for us and has been paid less attention in the previous studies. This paper introduces a new build-to-order problem in the supply chain. This study focuses on bo...

متن کامل

Effective heuristics and meta-heuristics for the quadratic assignment problem with tuned parameters and analytical comparisons

Quadratic assignment problem (QAP) is a well-known problem in the facility location and layout. It belongs to the NP-complete class. There are many heuristic and meta-heuristic methods, which are presented for QAP in the literature. In this paper, we applied 2-opt, greedy 2-opt, 3-opt, greedy 3-opt, and VNZ as heuristic methods and tabu search (TS), simulated annealing, and pa...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • J. Heuristics

دوره 12  شماره 

صفحات  -

تاریخ انتشار 2006