Tucuruí Hydro-Power Complex (Brazil) FINAL SCOPING REPORT

نویسنده

  • Oscar de Moraes
چکیده

part of its information-gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission. part of its information-gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission. Disclaimer This is a working paper of the World Commission on Dams-the report published herein was prepared for the Commission as part of its information gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission. The Commission's views, conclusions, and recommendations will be set forth in the Commission's own report. part of its information-gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission. (social issues) Dr. Eneas Salati (ecological issues) Dr. Gilberto Canali (technical and economic issues) Researchers: Marcia Gomes Ismerio (management, social issues) Maria das Graças da Silva (regional planning) Oscar de Moraes Cordeiro Netto (management, technical and economic issues) part of its information-gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Intraday Optimization of Pumped Hydro Power Plants in the German Electricity Market ¬リニ

Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market make this process much more complex: Power plant operators are committed to report information on planned production and even on provision of balancing energy of each single generator to transmission system operators. As soon as a deviati...

متن کامل

Preliminary Ranking Study of Hy

Central Electricity Authority have completed the preliminary ranking study of hydro electric schemes to harness the balance hydro electric potential in the country. Hon’ble Union Minister of Power Shri Suresh Prabhu released the report on "Preliminary Ranking Study of Hydro Electric Schemes" on 5th February 2002 at the International Conference and Business Meet on Non-fossil fuel generation org...

متن کامل

Complex Leadership in Healthcare: A Scoping Review

Background Nowadays, health systems are generally acknowledged to be complex social systems. Consequently, scholars, academics, practitioners, and policy-makers are exploring how to adopt a complexity perspective in health policy and system research. While leadership and complexity has been studied extensively outside health, the implications of complexity theories for the study of leader...

متن کامل

International Scoping Study Interim Report

Introduction The International scoping study of a future Neutrino Factory and Super-beam Facility (ISS) was established at NuFact 05 to survey the possibilities available for a future complex for precision neutrino physics to succeed the super beam experiments (T2K in Japan and Noνa in the USA) currently under construction. The possibilities centre around developments of the superbeam concept w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000