On the long - time integration of stochastic gradient systems
نویسنده
چکیده
Author for correspondence: B. Leimkuhler e-mail: [email protected] On the long-time integration of stochastic gradient systems B. Leimkuhler1, C. Matthews1 and M. V. Tretyakov2 1School of Mathematics and the Maxwell Institute for Mathematical Sciences, University of Edinburgh, Kings Buildings, Mayfield Road, Edinburgh EH9 3JZ, UK 2School of Mathematical Sciences, University of Nottingham, Nottingham NG7 2RD, UK
منابع مشابه
Identification of Multiple Input-multiple Output Non-linear System Cement Rotary Kiln using Stochastic Gradient-based Rough-neural Network
Because of the existing interactions among the variables of a multiple input-multiple output (MIMO) nonlinear system, its identification is a difficult task, particularly in the presence of uncertainties. Cement rotary kiln (CRK) is a MIMO nonlinear system in the cement factory with a complicated mechanism and uncertain disturbances. The identification of CRK is very important for different pur...
متن کاملTwo-Stage Stochastic Day-Ahead Market Clearing in Gas and Power Networks Integrated with Wind Energy
The significant penetration rate of wind turbines in power systems made some challenges in the operation of the systems such as large-scale power fluctuations induced by wind farms. Gas-fired plants with fast starting ability and high ramping can better handle natural uncertainties of wind power compared to other traditional plants. Therefore, the integration of electrical and natural gas syste...
متن کاملA multi-stage stochastic programming for condition-based maintenance with proportional hazards model
Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...
متن کاملA novel bi-level stochastic programming model for supply chain network design with assembly line balancing under demand uncertainty
This paper investigates the integration of strategic and tactical decisions in the supply chain network design (SCND) considering assembly line balancing (ALB) under demand uncertainty. Due to the decentralized decisions, a novel bi-level stochastic programming (BLSP) model has been developed in which SCND problem has been considered in the upper-level model, while the lower-level model contain...
متن کاملA Novel Method for Measuring the Quality of Temporal Integration in Public Transport Systems
Temporal coordination of services, as a crucial aspect of integration in public transport systems, has always been a big concern for transit planners and schedulers. One of the major issues in the way of coordinating transit services is the lack of a robust measure of effectiveness for assessing the quality of temporal coordination in public transport systems. Even though the network-wide summa...
متن کامل