Time bucket length and lot-splitting approach

نویسنده

  • J. RIEZEBOS
چکیده

The effect of time bucket length on the choice of a lot-splitting approach is studied. Due to the continuing pressure to reduce throughput times and increase efficiency, managers apply various measures, such as lot splitting and cycle time reduction programmes, that change the length of the time bucket in their planning systems. It is shown that the choice for a suitable lot-splitting approach depends on the time bucket length used, so these measures cannot be treated independently as costs may increase rapidly without substantial effect on throughput times. Moreover, the current belief in the lot-splitting literature that the improvements of a variable lot-splitting approach are only marginal compared with an equal sub-batch approach is challenged. Some papers estimate the possible flow time improvement to be less than 5%. It is shown that such statements are not valid as the improvement depends strongly on the type of equal sub-batch strategy applied and the length of the time bucket. Moreover, flow time improvements are accompanied by extra transfer costs, so a cost perspective that includes both effects is more appropriate. The paper shows that equal sub-batching is only effective if information on the time bucket length and on product characteristics is included. At time bucket lengths between one and three days, costs are very sensitive for the type of sub-batching strategy applied. Simulation experiments show that variable sub-batching leads to average cost improvements from 3 to 11%, depending on the time bucket length and the equal sub-batch strategy applied. Lower costs are due to throughput time reductions and transfer cost savings.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time Bucket Size and Lot-splitting Approach

We address the problem of lot splitting for various time bucket lengths in MRP systems. Two approaches for lot splitting can be applied: either use the same (equal) or a variable number of subbatches. Equal subbatching strategies have logistical and computational advantages. Literature states that variable batching strategies are only marginal better. However, these results do not take into acc...

متن کامل

Lot Splitting and Time Bucket Size in Planning System Design

This paper addresses the problem of the cost effectiveness of equal lot splitting approaches for various lenghts of the time bucket in planning systems. The results of the research indicate that an equal number of subbatches (lots) per time bucket for all products is inefficient. The magnitude of these inefficiencies depends on the time bucket length of the planning system. An appropriate varia...

متن کامل

Integrated JIT Lot-Splitting Model with Setup Time Reduction for Different Delivery Policy using PSO Algorithm

This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multi...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

Capacitated lot sizing with linked lots for general product structures in job shops

In this paper, we propose a mixed integer programming (MIP) model for a multi-level multi resource capacitated lot sizing and scheduling problem with a set of constraints to track dependent demand balances, that is, the amount left over after allocating the available inventory to the dependent demands. A part of this leftover amount may be kept as a reservation quantity to meet dependent demand...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004