Minimizing Makespan in a Multiclass Fluid Network with Parameter Uncertainty
نویسندگان
چکیده
We introduce and investigate a new type of decision problem related to multiclass fluid networks. Optimization problems arising from fluid networks with known parameters have been studied extensively in the queueing, scheduling, and optimization literature. In this article, we explore the makespan problem in fluid networks, with the assumption that the parameters are known only through a probability distribution. Thus, the decision maker does not have complete knowledge of the parameters in advance. This problem can be formulated as a stochastic nonlinear program. We provide necessary and sufficient feasibility conditions for this class of problems. We also derive a number of other structural results that can be used in developing effective computational procedures for solving stochastic fluid makespan problems.
منابع مشابه
A Robust Reliable Forward-reverse Supply Chain Network Design Model under Parameter and Disruption Uncertainties
Social responsibility is a key factor that could result in success and achieving great benefits for supply chains. Responsiveness and reliability are important social responsibility measures for consumers and all stakeholders that strategists and company managers should be concerned about them in long-term planning horizon. Although, presence of uncertainties as an intrinsic part of supply chai...
متن کاملScheduling of Residential Multiclass Appliances in Smart Homes UsingV2H Capability of Electric Vehicle
With the aim of reducing cost of electricity consumption and peak load reduction, tools requirement for better managing electricity consumption have become inevitable in recent years. Smart home has some equipment which are controllable and this ability is used for increasing comfort and minimizing electricity cost for residence. As a key component of smart home , Electric Vehicle(EV) ,increase...
متن کاملMeta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملMinimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملFuzzy Network Analysis for Projects with High Level of Risks – Uncertainty in Time and Structure
In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. In this paper we consider three types of i...
متن کامل