Fuzzy train tracking algorithm for the energy efficient operation of CBTC equipped metro lines

نویسندگان

  • William Carvajal-Carreño
  • Asunción Paloma Cucala García
  • Antonio Fernández-Cardador
چکیده

In CBTC (Communications-Based Train Control) operated metro lines, headway can be reduced by taking advantage of the system's train–track continuous communication, thus increasing transport capacity. When a train runs close enough to the preceding one, a tracking algorithm is triggered to control the distance between the trains. The following train receives the LMA (limit of movement authority) via radio, which is updated periodically as the preceding train runs. Besides transport capacity, one of railway operators’ main goals is the reduction of energy consumption, for environmental and economic reasons. This paper firstly shows that the existing basic CBTC tracking algorithm is not energy efficient, due to the application of short braking–traction cycles. It then proposes a new efficient algorithm that makes use of coast (null traction) command, and models the uncertainty associated with the speed of the preceding train. This fuzzy algorithm is compared to the basic one in terms of energy consumption, running time and steady state interval (resulting tracking interval). Simulation results show that the proposed fuzzy tracking algorithm provides important energy savings with minor influence on running time and steady state interval. This algorithm is suitable for implementation in on-board CBTC equipment to reduce the energy consumption of traffic operation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal design of energy-efficient ATO CBTC driving for metro lines based on NSGA-II with fuzzy parameters

One of the main priorities for metro line operators is the reduction of energy consumption, due to the environmental impact and economic cost. The new moving block signalling system CBTC (Communication Based Train Control) is being installed in order to increase the transport capacity of new metro lines, and to upgrade lines equipped with the former fixed block signalling systems. In addition, ...

متن کامل

Controlling Train Power Consumption with Energy Storage Based on Fuzzy Control - Case Study on Line 3 of Tehran Metro

New high-speed trains need modern energy management methods to reduce energy consumption. A fuzzy method based control method was used to solve this problem in this paper and evaluated the results on basis of data in Tehran metro line 3. Recovering the maximum amount of train kinetic energy when it is in the braking mode and optimal division of traction systems demand between energy storage sys...

متن کامل

Design, Development and Test of a Practical Train Energy Optimization using GA-PSO Algorithm

One of the strategies for reduction of energy consumption in railway systems is to execute efficient driving by presenting optimized speed profile considering running time, energy consumption and practical constraints. In this paper, by using real route data, an approach based on combination of Genetic and Particle swarm (GA-PSO) algorithms in order to optimize the fuel consumption is provided....

متن کامل

FUZZY TRAIN ENERGY CONSUMPTION MINIMIZATION MODEL AND ALGORITHM

Train energy saving problem investigates how to control train's velocity such that the quantity of energy consumption is minimized and some system constraints are satis ed. On the assumption that the train's weights on different links are estimated by fuzzy variables when making the train scheduling strategy, we study the fuzzy train energy saving problem. First, we propose a fuzzy energy ...

متن کامل

Upgrade of Signaling System on the Rapid Transit Systems

In this paper, discuss the upgrade system for an old type and extend to new line system of signaling at Taipei Rapid Transit Systems (RTS). Since the track circuits of fixed block are utilized the frequency loops and audio frequency track circuits of train position detected on the automatic train protect system. At present, Neihu line is the new extension construction of Muzha line, due to the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Eng. Appl. of AI

دوره 53  شماره 

صفحات  -

تاریخ انتشار 2016