An Integrated Database for Real-time Management of Stockyard "stockman": a Case Study in Precast Concrete Products Industry
نویسندگان
چکیده
This project is a follow up from a stockyard layout planning research conducted by the authors where simulation approach has been used to establish the best stock layout for the efficient storage, loading and dispatch of precast concrete products. It was concluded from the research that a more robust real-time management system should be in place to implement stockyard layout plans and assist production planners and stockyard managers to monitor stock movement to retrieve products in an efficient manner. A real time database system "StockMan" has been designed to manage the stock of concrete products, that is integrated with AutoCAD and simulation model for efficient positioning and visualisation of the stock. The storage locations for the products are determined through the simulation model and actual supply from the production lines (presses). In this paper, database development, integration with planning and forecasting system, information exchange and visualisation are presented. This is a real time management system that is capable of assisting managers with decision making in stock movement and control.
منابع مشابه
Simulation Modeling and Optimization of Stockyard Layouts for Precast Concrete Products
Stockyard is a hob of information that reflects the production, stock and sales of precast concrete products. The stockyard layout plays an important role in storage and retrieval of the products. Stockyard layout planning offers a complex task as large number of products are involved with different handling and storage requirements, and large stock is inevitable due to seasonality of demand. T...
متن کاملSimulation Approach to Optimise Stockyard Layout: a Case Study in Precast Concrete Products Industry
The precast concrete products industry supplies 2,000 to 4,000 of different products to the construction industry. The demand for the products is seasonal. The industry builds up the stock in winter to meet the high demand in summer. As large numbers of products varying sizes and weights are involved, different handling and stacking requirements, the process of deciding appropriate locations to...
متن کاملIntegration of Genetic Algorithms and Simulation for Stockyard Layout Planning
This paper describes the development of a process simulation model and integration of the Genetic Algorithms (GA) with the model as optimisation techniques using a case study of stockyard layout planning in precast concrete products industry. Genetic algorithms have been used for two purposes: firstly, to identify clusters of concrete products by analysing sales historical data such that freque...
متن کاملUse of Embedded Rfid Tags in Concrete Element Supply Chains
Precast concrete components are basic element of modern construction industry. Their lifecycle involves many steps, in which the element's progress is usually tracked on paper. Similarly construction projects do not often have a formal information management process. Increased traceability and information management could address issues related to duplicated information management work, lack of...
متن کامل3d Modeling and Real-time Monitoring in Support of Lean Production of Engineered-to-order Precast Concrete Buildings
Previous research has highlighted the efficacy of the application of lean production principles in the precast concrete industry. The work also highlighted the dependence of engineered-to-order prefabrication in construction on both engineering and on process control information for production in construction. In current practice in most precast/prestressed plants in the US, producers typically...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2001