IMACS: A Case Study in Real-World Planning

نویسندگان

  • Satyandra K. Gupta
  • Dana S. Nau
  • William C. Regli
چکیده

This article illustrates the complexities of real-world planning and how we can create AI planning systems to address them. We describe the IMACS Project (Interactive Manufacturability Analysis and Critiquing System) from the University of Maryland, College Park. IMACS is an automated designer's aid to evaluate the manufacturability of machined parts and suggest design modi cations to improve manufacturability. Over the course of our e orts on IMACS the manufacturing domain continually challenged us to come up with working solutions that would scale to realistic problems. This paper compares and contrasts IMACS's planning techniques with those used in classical AI planning systems and describes (1) how some of IMACS's planning techniques may be useful for AI planning in general, and (2) what challenges need to be overcome by AI planners so that they can be successfully used in manufacturing process planning. Similarities between AI planning techniques and IMACS planning techniques indicate the large unrealized potential of AI planning techniques in solving real-world manufacturing problems. On the other hand, di erences seem to indicate the need for domain-speci c planning techniques. In particular, our experience suggests that process planning for complex machined parts would not be accomplished very well by populating a general purpose planner with domain-speci c knowledge. Instead, we needed to integrate the domain-speci c knowledge into the planning algorithms themselves.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A LINEAR PROGRAMMING MODEL FOR PRODUCTION PLANNING: AN IRANIAN CASE STUDY IN CEMENT

Production planning and inventory control efforts are known as the driving engines of manufacturing systems. The manufacturers, competing to survive in these days’ competitive business environment, aim to satisfy customers’ needs. This requires a precise production plan throughout the supply chain. These days, because of the increasing costs of production and distribution, especially in the cem...

متن کامل

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem

Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...

متن کامل

To appear IJCAI August AI Planning Versus Manufacturing Operation Planning A Case Study

Although AI planning techniques can poten tially be useful in several manufacturing do mains this potential remains largely unreal ized In order to adapt AI planning techniques to manufacturing it is important to develop more realistic and robust ways to address issues important to manufacturing engineers Fur thermore by investigating such issues AI re searchers may be able to discover principl...

متن کامل

Sustainable Planning of Supply Chains in Large-Scale Systems with Real Options Analysis

This paper presents a structure that empower designing supervisory groups to survey the estimation of real options in projects of enormous scale, incompletely standardized frameworks actualized a couple of times over the medium term. Specific options writing is done using a methodology of planning the design and making prior decisions regarding the arrangements of specific options, with a recre...

متن کامل

A novel bi-objective reliable location routing model considering impedance function under demand-side and supply-side uncertainty (A Case study)

Reliable location routing problem considers a location problem and a vehicle routing problem in order to select the optimal location of facilities and at the same time the optimal routes for vehicles considering the unexpected failure for facilities in which, all facilities may fail with a probability. In this paper, a bi-objective mathematical model has been developed to minimize the total cos...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IEEE Intelligent Systems

دوره 13  شماره 

صفحات  -

تاریخ انتشار 1998