A local search heuristic for a mixed integer nonlinear integrated airline schedule planning problem

نویسندگان

  • Bilge Atasoy
  • Matteo Salani
  • Michel Bierlaire
چکیده

In this paper we present a local search heuristic method for an integrated airline scheduling, fleeting and pricing model. The integrated model simultaneously optimizes the decisions of schedule design, fleet assignment, seat allocation, pricing and considers passengers’ spill and recapture. The resulting problem is a mixed integer non-convex problem due to the explicit representation of a demand model which guides the revenue management decisions. The local search heuristic tackles the complexity of the problem decomposing the problem into two simplified versions of the integrated model. The first model is a fleet assignment model where the pricing decision is fixed. The fleet assignment sub-model is a mixed integer linear problem. The second model is a revenue management model where the fleet assignment decision, i.e., the transportation capacity, is fixed. This revenue sub-model is a continuous nonlinear problem. These sub-models are solved in an iterative way with intelligent local search mechanisms. Price sampling is used for a local search on price and variable neighborhood search techniques are used for exploring superior fleet assignment decisions. Metaheuristic mechanisms permit to escape from local optima. The local search heuristic is presented in comparison to two other heuristic approaches: a heuristic procedure provided by an open-source generic MINLP solver and a sequential approach which mimic the current practice of airlines. The three approaches are tested on a set of experiments with different problem sizes. The local search heuristic outperforms the two other approaches in terms of the quality of the solution and computational time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts

Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...

متن کامل

Coordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling

This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...

متن کامل

Integrated schedule planning with supply-demand interactions for a new generation of aircrafts

We present an integrated schedule planning model where the decisions of schedule design, fleeting and pricing are made simultaneously. Pricing is integrated through a logit demand model where itinerary choice is modeled by defining the utilities of the alternative itineraries. Spill and recapture effects are appropriately incorporated in the model by using a logit formulation similar to the dem...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013