Minimizing the Project Cost with Generalized Precedence Relations
نویسندگان
چکیده
Minimizing the project cost is a task of project scheduling, and usually is a starting point in the optimization about cost, for example the time-cost tradeoff is to compress the project duration from the one with minimum cost. Project cost can be minimized by letting all activities choose their minimum cost durations only when strict precedence relations exist between activities. But if generalized precedence relations (GPRs) exist between activities, letting all activities choose their minimum cost durations may not satisfy the given precedence relationships and result in a unfeasible project. In minimizing the project cost with GPRs, we transformed the mathematical programming model into two equivalent special models: a minimum cost maximum flow model and a transportation model with balanced supply and demand. The two special models can be solved by using any current efficient algorithms.
منابع مشابه
Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملProject Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources
Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...
متن کاملA mathematical model for the multi-mode resource investment problem
This paper presents an exact model for the resource investment problem with generalized precedence relations in which the minimum or maximum time lags between a pair of activities may vary depending on the chosen modes. All resources considered are renewable. The objective is to determine a mode and a start time for each activity so that all constraints are obeyed and the resource investment co...
متن کاملDevelopment of a Set of Algorithms for the Multi-Project Scheduling Problems
In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...
متن کاملMinimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound
In this paper we study an extension of the classical Resource-Constrained Project Scheduling Problem (RCPSP) with minimum makespan objective by introducing a further type of precedence constraints denoted as “Feeding Precedences” (FP). This kind of problem happens in that production planning environment, like make-to-order manufacturing, when the effort associated with the execution of an activ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JSW
دوره 11 شماره
صفحات -
تاریخ انتشار 2016