Resolving the Commitment versus Flexibility Trade-off: the Role of Resource Accumulation Lags
نویسنده
چکیده
We examine how time-consuming resource accumulation influences the classic strategy trade-off between commitment and flexibility. In particular, using 1975–95 data from the worldwide petrochemical industry, we study the impact of new plants’ time-to-build on firms’ decisions to invest under uncertainty. Our results suggest a nontrivial positive effect of resource accumulation lags on investment. Contradicting conventional wisdom, we show that competition may be fiercer in industries in which firms accumulate resources more slowly and that uncertainty is not always a disincentive for investment. The robustness of these results is only diminished for extremely long resource accumulation lags.
منابع مشابه
A mathematical model for the multi-mode resource investment problem
This paper presents an exact model for the resource investment problem with generalized precedence relations in which the minimum or maximum time lags between a pair of activities may vary depending on the chosen modes. All resources considered are renewable. The objective is to determine a mode and a start time for each activity so that all constraints are obeyed and the resource investment co...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملPeaceful methods of The International Disputes Settlement and their impact on the development of international trade; With Emphasizing on the scope of the energy industry
International trade litigation represents, the extent to which countries participate in international trade, as well as its business activities on various economic issues. Since energy is one of main pillars of international trade, settlement international disputes can play an important role in international trade.This is especially evident in the energy sector, which plays an important role in...
متن کامل