A New Technique for Estimating the Distribution of a Stochastic Project Makespan
نویسندگان
چکیده
A critical success dimension in projects is the ability to complete a project within an estimated duration. In that regard, effective project scheduling techniques in an uncertain environment is of interest in many organizations. In this paper, the authors use an analytic approach to analyze the behavior of time duration distributions of projects in stochastic activity networks, and propose a simple computation scheme for approximating their distribution. The findings offer an understanding of the large gap between PERT and simulation results, and the deviation of projects from their intended schedules. In addition to providing theoretical framework, the proposed approach also recommends a simple practical pragmatic technique that computes the time distribution of project duration. This is a simple and handy tool for the project manager that may replace simulation. As a byproduct, the earliest start time distribution for each activity is also estimated.
منابع مشابه
Combination of Approximation and Simulation Approaches for Distribution Functions in Stochastic Networks
This paper deals with the fundamental problem of estimating the distribution function (df) of the duration of the longest path in the stochastic activity network such as PERT network. First a technique is introduced to reduce variance in Conditional Monte Carlo Sampling (CMCS). Second, based on this technique a new procedure is developed for CMCS. Third, a combined approach of simulation and ap...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملA New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management
In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملA new Stochastic Hybrid Technique for DER Problem
This paper presents a new Hybrid Particle Swarm optimization with Time Varying Acceleration Coefficients (HPSOTVAC) and Bacteria Foraging Algorithm (BFA) namely (PSOTVAC/BFA) base fuzzy stochastic long term approach for determining optimum location and size of Distributed Energy Resources (DERs). The Monte Carlo simulation method is used to model the uncertainties associated with long-term load...
متن کاملA new Stochastic Hybrid Technique for DER Problem
This paper presents a new Hybrid Particle Swarm optimization with Time Varying Acceleration Coefficients (HPSOTVAC) and Bacteria Foraging Algorithm (BFA) namely (PSOTVAC/BFA) base fuzzy stochastic long term approach for determining optimum location and size of Distributed Energy Resources (DERs). The Monte Carlo simulation method is used to model the uncertainties associated with long-term load...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJITPM
دوره 1 شماره
صفحات -
تاریخ انتشار 2010