Optimisation of temporal networks under uncertainty
نویسنده
چکیده
A wide variety of decision problems in operations research are defined on temporal networks, that is, workflows of time-consuming tasks whose processing order is constrained by precedence relations. For example, temporal networks are used to formalise the management of projects, the execution of computer applications, the design of digital circuits and the scheduling of production processes. Optimisation problems arise in temporal networks when a decision maker wishes to determine a temporal arrangement of the tasks and/or a resource assignment that optimises some network characteristic such as the network’s makespan (i.e., the time required to complete all tasks) or its net present value. Optimisation problems in temporal networks have been investigated intensively for more than fifty years. To date, the majority of contributions focus on deterministic formulations where all problem parameters are known. This is surprising since parameters such as the task durations, the network structure, the availability of resources and the cash flows are typically unknown at the time the decision problem arises. The tacit understanding in the literature is that the decision maker replaces these uncertain parameters with their most likely or expected values to obtain a deterministic optimisation problem. It is well-documented in theory and practise that this approach can lead to severely suboptimal decisions. The objective of this thesis is to investigate solution techniques for optimisation problems in temporal networks that explicitly account for parameter uncertainty. Apart from theoretical and computational challenges, a key difficulty is that the decision maker may not be aware of the precise nature of the uncertainty. We therefore study several formulations, each of which requires different information about the probability distribution of the uncertain problem parameters. We discuss models that maximise the network’s net present value and problems that minimise the network’s makespan. Throughout the thesis, emphasis is placed on tractable techniques that scale to industrial-size problems.
منابع مشابه
Optimising Bounds in Simple Temporal Networks with Uncertainty under Dynamic Controllability Constraints
Dynamically controllable simple temporal networks with uncertainty (STNU) are widely used to represent temporal plans or schedules with uncertainty and execution flexibility. While the problem of testing an STNU for dynamic controllability is well studied, many use cases – for example, problem relaxation or schedule robustness analysis – require optimising a function over STNU time bounds subje...
متن کاملAnalyzing Bullwhip Effect in Supply Networks under Exogenous Uncertainty
This paper explains a model for analyzing and measuring the propagation of order amplifications (i.e. bullwhip effect) for a single-product supply network topology considering exogenous uncertainty and linear and time-invariant inventory management policies for network entities. The stream of orders placed by each entity of the network is characterized assuming customer demand is ergodic. In fa...
متن کاملEvolutionary Bayesian Belief Networks for Participatory Water Resources Management under Uncertainty
A participatory integrated (social, economic, environmental) approach based on causal loop diagram, Bayesian belief networks and evolutionary multiobjective optimisation is proposed for efficient water resources management. The proposed methodology incorporates all the conflicting objectives in the decision making process. Causal loop diagram allows a range of different factors to be considered...
متن کاملEvaluating the Effectiveness of Integrated Benders Decomposition Algorithm and Epsilon Constraint Method for Multi-Objective Facility Location Problem under Demand Uncertainty
One of the most challenging issues in multi-objective problems is finding Pareto optimal points. This paper describes an algorithm based on Benders Decomposition Algorithm (BDA) which tries to find Pareto solutions. For this aim, a multi-objective facility location allocation model is proposed. In this case, an integrated BDA and epsilon constraint method are proposed and it is shown that how P...
متن کاملExecution Monitoring with Quantitative Temporal Bayesian Networks
The goal of execution monitoring is to determine whether a system or person is following a plan appropriately. Monitoring information may be uncertain, and the plan being monitored may have complex temporal constraints. We develop a new framework for reasoning under uncertainty with quantitative temporal constraints – Quantitative Temporal Bayesian Networks – and we discuss its application to p...
متن کامل