Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects
نویسندگان
چکیده
Abstract—The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.
منابع مشابه
Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic
The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...
متن کاملFuzzy Modeling of Minimal Crediting Risks in Investment Decisions
This article proposes a novel fuzzy technology to support the investment decisions. While choosing among competitive investment projects, this technology provides the selection of projects with minimal crediting risks, makes ranking of chosen projects and then allows to optimally allocate investment amounts between several of them. The technology combines two fuzzy-statistical methods and solut...
متن کاملA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...
متن کاملA Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses
The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...
متن کاملDecision Support’s precising Technology in the Investment Project Risk Management
In this work the Decision Support's precising technology for the credit risk minimization is proposed in selection of investment projects. This is a novel technology combining fuzzy discrimination and the expertons method. The technology offers two stages of evaluation of investment projects. In the first stage, projects with insignificant or low risks are selected with the aid of the expertons...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014