Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
نویسنده
چکیده
This paper summarizes the main existing approaches to propagate resource constraints in Constraint-Based scheduling and identifies some of their limitations for using them in an integrated planning and scheduling framework. We then describe two new algorithms to propagate resource constraints on discrete resources and reservoirs. Unlike most of the classical work in scheduling, our algorithms focus on the precedence relations between activities rather than on their absolute position in time. They are efficient even when the set of activities is not completely defined and when the time window of activities is large. These features explain why our algorithms are particularly suited for integrated planning and scheduling approaches. All our algorithms are illustrated with examples. Encouraging preliminary results are reported on pure scheduling problems as well as some possible extensions of our framework. 2002 Elsevier Science B.V. All rights reserved.
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملTASA: A New Task Scheduling Algorithm in Cloud Computing
Cloud computing refers to services that run in a distributed network and are accessible through common internet protocols. It merges a lot of physical resources and offers them to users as services according to service level agreement. Therefore, resource management alongside with task scheduling has direct influence on cloud networks’ performance and efficiency. Presenting a proper scheduling ...
متن کاملA New Job Scheduling in Data Grid Environment Based on Data and Computational Resource Availability
Data Grid is an infrastructure that controls huge amount of data files, and provides intensive computational resources across geographically distributed collaboration. The heterogeneity and geographic dispersion of grid resources and applications place some complex problems such as job scheduling. Most existing scheduling algorithms in Grids only focus on one kind of Grid jobs which can be data...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Artif. Intell.
دوره 143 شماره
صفحات -
تاریخ انتشار 2003