Beamline Rf Load Development at Cornell

نویسنده

  • E. Chojnacki
چکیده

Details of design and fabrication of a beamline RF load suited to accommodate SRF cavities are presented. Bonding an RF absorber to a heat sink is the key aspect of the load. Production loads have been effectively tested to 10.8 kW and operated in situ up to 3 kW.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Operating Experience with Superconducting Rf at Cesr and Overview of Other Srf Related Activities at Cornell University

In the two years past since 8 RFSC Workshop the major efforts of the SRF group at Cornell University were concentrated on the completion and commissioning of the superconducting RF system for the Cornell Electron Storage Ring (CESR) e+e− collider [1, 2]. Four singlecell niobium higher-order mode (HOM) damped cavities replaced four 5-cell normal conducting RF cavities. The RF system upgrade bega...

متن کامل

Application of NEG Coatings on a Metal Surface and Measurements of its RF Properties

The Energy Recovery Linac (ERL) at Cornell University will require the use of thin film coatings for purposes of achieving Ultra High Vacuum (UHV). At this point, various pipe coatings have been widely used in the field of particle accelerator physics. The vacuum properties of pipe coatings are well documented and have given rise to its popularity in the field. A Non-Evaporable Getter (NEG) coa...

متن کامل

Noise reduction for the infrared beamline at the Advanced Light Source

Significant reductions in the noise of the infrared light have been made at Beamline 1.4.3 infrared source at the Advanced Light Source (ALS). The primary source of vibrational noise has been identified as the water system for the storage ring RF system, which is located near the beamline. Modifications to this system have reduced the noise by an order of magnitude. The dominant source of highe...

متن کامل

Design and performance of the APPLE-Knot undulator

Along with the development of accelerator technology, synchrotron emittance has continuously decreased. This results in increased brightness, but also causes a heavy heat load on beamline optics. Recently, optical surfaces with 0.1 nm micro-roughness and 0.05 µrad slope error (r.m.s.) have become commercially available and surface distortions due to heat load have become a key factor in determi...

متن کامل

A New Digital Control System for Cesr-c and the Cornell Erl

M. Liepe , S. Belomestnykh, J. Dobbins, R. Kaplan, C. Strohman, LEPP, Cornell University, Ithaca, NY 14853, USA Abstract Recent progress in developing digital low-level RF controls for accelerators has made digital systems an option of choice. At Cornell we are presently working on two projects: upgrading the RF controls of the Cornell Electron Storage Ring (CESR) for charm-tau operation (CESR-...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999