Ssrl Rf System Upgrade*

نویسنده

  • Sanghyun Park
چکیده

The Stanford Synchrotron Radiation Laboratory started its operation as a parasitic light source in 1973, becoming a fully dedicated user facility in 1992. A project was approved in 1998 to upgrade the storage ring to a third generation source. In order to sustain higher current in a tightly reconfigured magnetic lattice, it became necessary to upgrade the RF system from the present 5-cell cavity to four units of single-cell cavities to be powered by one high-power or two low-power klystrons. We present an overview of the upgrade project to be completed by the year 2002.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Spear 3 - a Low Emittance Source for Ssrl*

SSRL is planning to upgrade the 3 GeV SPEAR storage ring in FY 2002 to reduce the emittance from 160 nm-rad to 18 nm-rad and to increase the beam current from 100 to 200 mA, and then towards 500 mA as photon beam lines are upgraded. The core of the ’SPEAR 3’ project includes new magnets and power supplies for a DBA lattice, vacuum chamber, and a modedamped RF cavity system. Beam lines will see ...

متن کامل

Collective Effects in Spear 3

SSRL is investigating an upgrade to run SPEAR with a small emittance (4; nm) and with a 533 833 mA current, signi¿cantly greater than the present 433 mA value of SPEAR 2. Using experimental measurements, numerical calculations of impedance, and results from tracking code simulations, an impedance model for SPEAR 3 is calculated. Beam quality and instability thresholds for these results are pred...

متن کامل

The Stanford Automated Mounter: pushing the limits of sample exchange at the SSRL macromolecular crystallography beamlines

The Stanford Automated Mounter System, a system for mounting and dismounting cryo-cooled crystals, has been upgraded to increase the throughput of samples on the macromolecular crystallography beamlines at the Stanford Synchrotron Radiation Lightsource. This upgrade speeds up robot maneuvers, reduces the heating/drying cycles, pre-fetches samples and adds an air-knife to remove frost from the g...

متن کامل

Superconducting Rf System Upgrade for Short Bunch Operation of Cesr*

The CESR luminosity upgrade plan calls for shortening bunch length to 1 cm. Such bunch length can be achieved by installing two more superconducting cavities to increase total RF voltage. The RF system upgrade necessary to accommodate this change is discussed.

متن کامل

SPEAR 3 – A Technology Investment Today for Science Tomorrow

To provide new scientific opportunity and better serve an expanding user community, SSRL will replace the SPEAR storage ring with a 500 mA, 3 GeV machine SPEAR 3. The 4-year, 58 M$ upgrade is funded jointly by the US DOE and the NIH. The main goals are to significantly increase photon beam brightness and stability for the user community. To achieve these goals, the SPEAR 3 project includes a ne...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999