Final Projects

نویسنده

  • Paul J. Atzberger
چکیده

Instructions: In the final project you will apply the numerical methods developed in the class to a problem in finance or physics and engineering. For your assigned project you are to write a report which answers each of the stated questions. For the numerical solutions, you are to give the numerical results in the form of an appropriate table or list. All codes should be written in Matlab/Octave using the algorithms discussed in class.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

Adjusting the weights of assessment elements in the evaluation of Final Year Projects

The authors of this paper have defined a continuous evaluation methodology for Final Year Projects, in which six different evaluable items are involved. However, establishing the weights of each assessment element in the evaluation of Final Year Projects is a complex process, especially when several teachers are involved [3] like in this case. In this paper, the experiment carried out in order ...

متن کامل

An Overview of STOPS

The 2013 Final Rule on major capital investment projects revised the measures that FTA uses to evaluate and rate proposed major transit projects. Among the revised measures, the Final Rule specifies that mobility benefits are now measured as the predicted number of trips that would use the project, with a weight of 2.0 applied to project trips that would be made by transit dependents. The Final...

متن کامل

The Role of RFID to Improve Materials Flow in Mega-projects Site

In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...

متن کامل

The Role of RFID to Improve Materials Flow in Mega-projects Site

In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...

متن کامل

Investigation of the Productivity of Networking Activities and Improvement Projects on the Sales and Employment of Iranian Agricultural Clusters

O ne of the effective strategies for economic development of clusters is the conduct of networking activities by cluster members. Indeed, the majority of cluster members are micro and small enterprises, so, should attempt to overcome their inherent constraints and influence the market through networking activities. In addition, these enterprises lack an intra-firm research and develo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006