A Search Cost Perspective on Formation and Duration of Trade

نویسنده

  • Tibor Besedeš
چکیده

More than half of all US import relationships begin with less than $10,000 annually. The median relationship is observed to last just one year. The incidence and duration of these relationships are consistent with a search model of international trade. The preponderance of small starting relationships reveals uncertainty present in formation of trade relationships. Initial size, reliability, and search costs matter and play an important role. Larger initial purchase results in longer relationships. Higher reliability and lower search costs lead to larger initial purchases and longer relationships. JEL Codes: F14, C41

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEPARTMENT OF ECONOMICS WORKING PAPER SERIES A Search Cost Perspective on Duration of Trade

More than half of all US import relationships begin with less than $10,000 annually. The median relationship is observed to last just one year. The incidence and duration of these relationships are consistent with a matching model of international trade. The preponderance of small starting relationships reveals uncertainty present in formation of trade relationships. Initial size, reliability, ...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

Defining Pathways and Trade-offs Toward Universal Health Coverage; Comment on “Ethical Perspective: Five Unacceptable Trade-offs on the Path to Universal Health Coverage”

The World Health Organization’s (WHO’s) World Health Report 2010, “Health systems financing, the path to universal coverage,” promoted universal health coverage (UHC) as an aspirational objective for country health systems. Yet, in addition to the dimensions of services and coverage, distribution of coverage in the population, and financial risk protection highlighted by the report, the conside...

متن کامل

Policy Choices for Progressive Realization of Universal Health Coverage; Comment on “Ethical Perspective: Five Unacceptable Trade-offs on the Path to Universal Health Coverage”

In responses to Norheim’s editorial, this commentary offers reflections from Thailand, how the five unacceptable trade-offs were applied to the universal health coverage (UHC) reforms between 1975 and 2002 when the whole 64 million people were covered by one of the three public health insurance systems. This commentary aims to generate global discussions on how best UHC can be gradually achieve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007