Vendor Related Risks in IT Development: A Chronology of an Outsourced Project Failure

نویسنده

  • Joseph Natovich
چکیده

A Many organizations consider outsourcing their information technology (IT) development projects as an attractive risk-mitigating approach. In such an engagement, the vendor may agree to complete a project for a fixed cost and according to a defined time schedule. Nevertheless, while the vendor is liable for the traditional project risks, other forms of risk may arise, which are the vendor risks. This paper presents a recent case study of a project failure that demonstrates some of the major vendor risks and their contribution to system development failure. The risks discussed in the paper are: (a) Adversarial relationships and loss of trust between the vendor and the client; (b) Vendor management de-escalation of commitment; and (c) Difficulty in breaking the contractual engagement. The case shows that by outsourcing, an organization might not eliminate the traditional IT project risks but rather exchange them for equally fatal vendor risks. Furthermore, the case raises doubts regarding the effectiveness of the contract-driven control approach to mitigate vendor risks. This paper suggest that perhaps, since placing all risks on the vendor is impractical, a partnership approach of sharing risks and rewards may be more effective in bringing the client and the vendor to successful project outcomes.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Outsourced IT Projects from the Vendor Perspective: Different Goals, Different Risks

As outsourced and multinational IT projects become more common, managing risks for these projects is increasingly important. The research reported here examines key risks identified by Hong Kong vendor project managers working on both local and international package implementation projects. In addition to the typical risks that threaten project outcome success, respondents noted location-specif...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Exploring the Contribution of Problems in Team-Level Functionality to the Failure of Offshore-Outsourced Software Projects

Offshore outsourcing has been growing steadily since the 1990s, and this trend of sourcing services from low-cost countries such as India and China will continue in the near future. Despite the inherent challenges of offshore-outsourced software development (OOSD) projects, organizations in high-cost countries engage in OOSD projects because of compelling cost differences. We investigated the t...

متن کامل

Why Project Managers Fail To Act Upon Early Warning Signs: Evidence From Failed Offshore-Outsourced Software Projects

In this increasingly globalized world, ever more software projects originating in high-cost countries are being undertaken by third-party organizations in low-cost countries. These projects, known as offshore-outsourced software development (OOSD) projects, exhibit offshore-specific risks that cause them to be more prone to failures than other types of projects. We investigated 19 failed OOSD p...

متن کامل

Exploring Failures at the Team Level in Offshore-Outsourced Software Development Projects

Offshore-outsourced software development (OOSD) projects involvemultifaceted risks throughout the project execution, as they are handed over tothird-party organizations and thus are exposed to more risks than in domesticoutsourcing or captive offshoring. We concentrate on failed OOSD projects inthis paper and analyze the unique aspects of such projects at the team level thatlead to failures. Us...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Techn. Analysis & Strat. Manag.

دوره 15  شماره 

صفحات  -

تاریخ انتشار 2003