Project Makespan Estimation: Computational Load of Interval and Point Estimates

نویسندگان

  • Maurizio Naldi
  • Marta Flamini
چکیده

The estimation of project completion time is to be repeated several times in the project planning phase to reach the optimal tradeoff between time, cost, and quality. Estimation procedures provide either an interval or a point estimate. The computational load of several estimation procedures is reviewed. A multiple polynomial regression model is provided for major interval estimation procedures and shows that the accuracy in the probability model for activities is the most influential factor. The computational time does not appear to be an impeding factor, though it is larger for MonteCarlo simulation, so that the computational time can be traded off in search of a simpler estimation procedure.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Approximating Bayes Estimates by Means of the Tierney Kadane, Importance Sampling and Metropolis-Hastings within Gibbs Methods in the Poisson-Exponential Distribution: A Comparative Study

Here, we work on the problem of point estimation of the parameters of the Poisson-exponential distribution through the Bayesian and maximum likelihood methods based on complete samples. The point Bayes estimates under the symmetric squared error loss (SEL) function are approximated using three methods, namely the Tierney Kadane approximation method, the importance sampling method and the Metrop...

متن کامل

CONSTANT STRESS ACCELERATED LIFE TESTING DESIGNWITH TYPE-II CENSORING SCHEME FOR PARETO DISTRIBUTION USING GEOMETRIC PROCESS

In many of the studies concerning Accelerated life testing (ALT), the log linear function between life and stress which is just a simple re-parameterization of the original parameter of the life distribution is used to obtain the estimates of original parameters but from the statistical point of view, it is preferable to work with the original parameters instead of developing inferences for the...

متن کامل

A Review of Numerical Methods for Computing Point and Interval Estimates by S-PLUS Package

For computing different point estimates such as method of moment and maximum like-lihood estimates and different interval estimates (classical confidence interval, unbi-ased confidence interval, HPD interval), we may deal with the equations which need be solved numerically. In this paper, some numerical methods for solving these type of equations are reviewed in S-PLUS package. Various examples...

متن کامل

Estimation of absolute error for the resources-constrained project scheduling problem

We consider some special cases of the NP -hard resource-constrained project scheduling problem (RCPSP ) to minimize the makespan. We conjecture that the ratio of the optimal makespan of RCPSP to that of the preemptive version of the problem is less than 2. We show that a well-known lower bounds for the problem may yield bad approximation ratios or its calculation is an NP -hard problem too. We ...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/1707.01880  شماره 

صفحات  -

تاریخ انتشار 2017