Identification of Factors Causing Time and Cost Overruns in Offshore Petroleum Modification Projects
نویسندگان
چکیده
Many of the production facilities and technologies operated on the Norwegian Continental Shelf are getting older and need to be modified to maintain the production performance at the desirable level. Each modification project is unique, and therefore needs to be evaluated and verified with consideration to all specifications. However, the oil and gas industry experience shows that the execution of modification projects within predefined time and cost are rather an exception, than a rule. In this paper we identify and discuss some of the factors that cause time and cost overruns in offshore facility modification projects. Furthermore, we discuss alternative cost methods to improve the quality and the accuracy of costs and time assessments.
منابع مشابه
Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects
Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...
متن کاملDelays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents, Causes and Remedies
Media reports abound on instances of prolonged delays and excessive cost overruns in infrastructure projects. Only a small number of projects get delivered in time and within the budget. Examples of successful project implementation, like construction of the Delhi Metro Rail, are few and appear only far in between. Indeed, the problem of time and cost overruns in India is widespread and severe....
متن کاملCost-Benefit Investigation of Offshore Wind Power Generation for Soroush Offshore Complex
Iranian offshore oil and gas platforms are mostly located in the Persian Gulf. Technical and environmental challenges resulted from an off-design running condition of processes on a platform are important issues. The weakness of strategies to stop or decrease the amount of greenhouse gas emission production rate in the Persian Gulf; which is intensively increasing, is another matter of concern....
متن کاملSignificant Factors Causing Cost Overruns in Large Construction Projects in Malaysia
Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...
متن کاملProject Management Issues in IT Offshore Outsourcing
Global partnerships are forming to take advantage of the cost savings associated with offshoring as well as other strategic benefits. Not all information technology offshoring projects, however, are successful. Cost overruns, increased complexity and defective code cause organizations to rethink their offshoring strategy and their methods for managing these projects. In this paper, project mana...