Open shop scheduling problems with late work criteria

نویسندگان

  • Jacek Blazewicz
  • Erwin Pesch
  • Malgorzata Sterna
  • Frank Werner
چکیده

The paper concerns the application of a non-classical performance measure, a late work criterion (Y, Yw), to scheduling problems. It estimates the quality of the obtained solution with regard to the duration of the late parts of tasks not taking into account the quantity of this delay. The paper provides the formal definition of the late work parameter, especially in the shop environment, together with its practical motivation. It contains general complexity studies and the results of investigating open-shop scheduling cases, i.e. two polynomial time algorithms for problems O | pmtn, ri | Yw and O2 | di = d | Y, as well as the binary NP-hardness proof for O2 | di = d | Yw.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

Generalized Cyclic Open Shop Scheduling and a Hybrid Algorithm

In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...

متن کامل

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

Is a Unit - Time Job Shop Not Easierthan

This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Discrete Applied Mathematics

دوره 134  شماره 

صفحات  -

تاریخ انتشار 2004