The IPACS project: when IT hits the fan
نویسنده
چکیده
This case summarizes a failed systems development project at the Green Valley Hospital. The project was part of a large strategic information systems plan aiming to lower costs, improve the quality of patient care and integrate the hospital's operations. To implement the project, the president of the hospital selected a $5.9 million system by Ibax. The users, who felt that the selected system did not satisfy their needs, rejected it during the testing process. As a result, the project was abandoned three years after its initiation. To provide the readers with a pragmatic understanding of MIS development, this case describes the key factors and behaviors that led to the failure. Also, it invites the readers to apply their project management and crisis management skills, and creativity in managing the aftermath of the project's failure.
منابع مشابه
The IPACS-Project at Glance – IPACS Benchmark Suite, Performance Modeling and Prediction Methods, Benchmarking Environment –
The IPACS-Project (Integrated Performance Analysis of Computer Systems), which was founded by the German Federal Department of Education, Science, Research and Technology (BMBF), wants to define a new basis for measuring system performance of distributed systems. Its objective is to develop methods for measuring system performance on High Performance Computers (HPC) based on low level benchmark...
متن کاملThe design of the IPACS distributed software architecture
The IPACS-project (Integrated Performance Analysis of Computer Systems) was founded by the Federal Department of Education, Science, Research and Technology (BMBF) in the program High-Performance-Computing to define a new standard for measuring system performance. One part of this research project is the design of a distributed architecture for execution of benchmarks on High Performance Comput...
متن کاملResearch on Properties of Fluid Pressure Drop for Electric Vehicle IGBT Pin Fin Heat Sink
The Performance of electric vehicle IGPT Pin fin heat sink can be measured by the temperature field and the fluid pressure and other parameters. In order to improve the cooling effect of Pin fin heat sink, diameter, length and distance of the fin was optimized combination. The relationship between pressure drop of the water inlet, outlet and pin fin parameters was analyzed and calculated. It wa...
متن کاملارزش تشخیصی ابزار HITS در مقایسه با ابزار CTS2 در غربالگری خشونت خانگی
Background & Aim: Violence against women is a serious social problem affecting public health. Given the relatively high prevalence of domestic violence and the need for screening, a simple tool for its correct diagnosis in a short time seems to be necessary. This study aimed to compare the diagnostic values of the HITS (Hurts, Insults, Threaten, and Screams) tool and CTS2 (Revised Conflict Tact...
متن کاملTowards Measuring the Project Management Process During Large Scale Software System Implementation Phase
Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JIT
دوره 14 شماره
صفحات -
تاریخ انتشار 1999