A Prototype of Upgrading Bepc Control System
نویسندگان
چکیده
We will use EPICS toolkit [1] to build a prototype for upgrading BEPC control system. The purposes are threefold: (1) Setup a network based distributed control system with EPICS. (2) Study some front-end control technology. (3) Merge the existing control systems into EPICS. The hardware architecture consists of three physical layers. The front-end layer consists of VME crate, PowerPC, VME I/O modules and interface boards (VME-CAMAC and Fieldbus). The back-end layer is a SUN workstation, which is used for application development. The two layers are connected via the middle layer which is 100M Ethernet. In order to preserve our investment in the hardware, the existing CAMAC hardware will remain. The CAMAC will be connected to the VME via CAMAC serial highway [2]. The operator interface will be developed with EPICS DM2K. High-level accelerator control applications will be studied as well with EPICS channel access and archive access.
منابع مشابه
Upgrade of Control System for the BEPCII
The BEPC will increase its luminosity ten times with upgrade of both the machine and detector, which is the project BEPCII. The project will be started at beginning of 2002 and finished within 3-4 years. In order to reach the goal of the BEPCII, a number of new equipment will be added in the system, such as the superconducting RF cavities, new magnet power supplies and beam feedback system, and...
متن کاملConstructing a Distributed Developing Environment Using Epics for Bepcii Control System
Probe: to debug database records. • Alarm handler ALH The current Beijing Electron Position Collider (BEPC) is going to be upgraded to reach a higher energy as 1.89 GeV and a luminosity of 1.0E33cms. A second storage ring will be installed in the same tunnel of BEPC. The control system of BEPCII will be constructed based on EPICS. During the past two years a basic prototype has been set up, inc...
متن کاملControl of a Robotic Wheel-Chair Prototype for People with Walking Disabilities
In this paper we present a system that could be used to help people with walking disabilities. A system consists of a prototype mobile robot platform equipped with a control board and a remote computer system, running with image processing algorithms, was used to develop a system for physically disabled human to move freely in an environment. We used a camera to get visual information by a huma...
متن کاملControl System of the Bepcii
Recently the Chinese Academy of Sciences has chosen BEPCII as the future development of the Beijing Electron Positron Collider (BEPC), i.e. upgrade of both the machine and detector. The luminosity of the machine is expected to increase to 1.0x10cms. The project will be started at the beginning of 2002 and finished within 3-4 years. The BEPC control system was built in 1987 and upgraded in 1994....
متن کاملImprovement of Beam Energy Measurement System for BES-III
The beam energy measurement system is significant and profit for both BES-III detector and BEPC-II accelerator. The detection of the high energy scattering photons is realized by virtue of the Compton backscattering principle. Many advanced techniques and precise instruments are employed to acquire the highly accurate measurement of positron/electron beam energy. During five years’ running peri...
متن کامل