Business-process modelling and simulation for manufacturing management: A practical way forward

نویسندگان

  • Kevin D. Barber
  • Frank W. Dewhurst
  • R. L. D. H. Burns
  • J. B. B. Rogers
چکیده

Many companies are taking a process view as a result of business-process re-engineering exercises, statutory compliance (e.g. Securities and Futures Authority), reaction to market forces (e.g. to achieve accreditation under ISO9001:2000 or BS5750) and the promotion of integrated computer and information systems (e.g. computer integrated manufacture). This means questioning the way in which companies operate and has implications for management. Business process modelling (BPM) and business-process simulation (BPS) help to facilitate process thinking. BPM provides management with a static structured approach to business improvement, providing a aholistico perspective on how the business operates, and provides a means of documenting the business processes while BPS allows management to study the dynamics of the business and consider the effects of changes without risk. There are a number of BPM and BPS methodologies, approaches and tools available, each of which may be applicable to different circumstances. This paper brie ̄y reviews the diverse literature in relation to manufacturing management. Evidence from the literature indicates that few tools are available for supporting manufacturing-business-process-management and that, except for a few small-scale processes, BPS implementations in manufacturing have had limited success. This paper identi®es the reasons for this and suggests a practical way forward until hardware and software limitations are overcome.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study on implementation of one-piece lean line design using simulation techniques: A practical approach

This paper discusses the simulation study carried out for proposing one-piece lean line layout with features of Lean Manufacturing. The lean initiatives that can be addressed are, introducing Kanban replenishment sys-tem, better work-in-process, changing the layout, visual management techniques, standardized work for the re-duction of cycle time, number of workers, number of setups. To improve ...

متن کامل

Balanced Scorecard with Fuzzy Inference as a Performance Measurement in an Automotive Manufacturing line

In recent years, the balanced score card (BSC) has been the focus of considerable methodology for strategic cost management in management accounting area since it was originally proposed by Kaplan ,R.S. and Norton, D.P. in 1992. BSC is an approach to performance measurement based on both financial and nonfinancial information from four perspectives which are called financial, customer, inter...

متن کامل

A knowledge centred framework for collaborative business process modelling

Purpose – The paper aims to present the design rationale, the structure and the use of a web-based information systems framework for collaborative business process modelling. Design/methodology/approach – By viewing process modelling as a “problematic situation” that entails a considerable amount of social and knowledge activity in order to be resolved, a novel process modelling construct has b...

متن کامل

Petri net-based process monitoring: a workflow management system for process modelling and monitoring

Nowadays business process management is becoming a fundamental piece in many industrial processes. To manage the evolution and the interactions of the business actions it is important to accurately model the steps to follow and the resources needed by a process. Workflows provide a way of describing the order of execution and the dependencies between the constituting activities of business proc...

متن کامل

Elimination of Waste and Inefficient Facilities in Existing Buildings for Sustainability in Developing Nations

A major reason why many developing nations have not made significant advancement in sustainable development (SD) agenda is the neglect of existing building stock which forms the bulk of built assets. Although sustainable development is a universal challenge, it cannot be approached in the same way for all nations, but rather practical response can be defined nationally or locally. This paper re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Business Proc. Manag. Journal

دوره 9  شماره 

صفحات  -

تاریخ انتشار 2003