A cost recovery model for tertiary canal improvement projects, with an example from Egypt
نویسنده
چکیده
The potential farm-level gains from improvements in a tertiary canal vary among farmers according to their location along the canal. An economic model describing that variation is developed using the concept of irrigation success, which considers the degree to which water volume and quality, and the timing of irrigation events match the requirements of plants throughout a season. A bid-rent model in which farm-level costs and returns are viewed as a function of irrigation success is used to describe the appropriate roles of public agencies in supporting or financing tertiary canal improvement projects and to evaluate cost recovery programs. An empirical version of the model is used to develop cost recovery alternatives for Egypt's Irrigation Improvement Project. A potentially viable cost recovery program is designed using the following criteria: (1) the net benefits of the improvement project are non-negative for all the farmers after making any required payments; (2) the net benefits are the same for all the farmers required to make annual payments, and (3) the total revenue collected each year is equal to the average annual cost of the project. Such a program would require estimated payments of $175 per ha for middle-reach farmers and $412 per ha for tail-end farmers along a typical canal in Egypt's Irrigation Improvement Project. The net benefits for farmers in each of those groups would be an estimated $102 per ha. Head-end farmers would not be required to pay an annual fee, though they would receive a net gain equal to an estimated $40 per ha reduction in annual pumping costs. Alternative programs that require smaller payments from middle-reach and tail-end farmers, while imposing costs also on head-end farmers, are designed using a combination of fixed and variable charges. Volumetric water charges ranging from $4.00 to $7.00 per 1000 m are examined, in conjunction with annual assessments ranging from $40 to $170 per ha. The installation of single-point pumping stations at the head ends of improved tertiary canals provides an opportunity to implement Agricultural Water Management 43 (2000) 29±50 * Tel:. +1-401-874-4565; fax: +1-401-782-4766. E-mail address: [email protected] (D. Wichelns) 0378-3774/00/$ ± see front matter # 2000 Elsevier Science B.V. All rights reserved. PII: S 0 3 7 8 3 7 7 4 ( 9 9 ) 0 0 0 4 7 5 volumetric charges in cooperation with water user associations. # 2000 Elsevier Science B.V. All rights reserved.
منابع مشابه
An improved particle swarm optimization with a new swap operator for team formation problem
Formation of effective teams of experts has played a crucial role in successful projects especially in social networks. In this paper, a new particle swarm optimization (PSO) algorithm is proposed for solving a team formation optimization problem by minimizing the communication cost among experts. The proposed algorithm is called by improved particle optimization with new swap operator (IPSONSO...
متن کاملA New Version of Earned Value Analysis for Mega Projects Under Interval-valued Fuzzy Environment
The earned value technique is a crucial and important technique in analysis and control the performance and progress of mega projects by integrating three elements of them, i.e., time, cost and scope. This paper proposes a new version of earned value analysis (EVA) to handle uncertainty in mega projects under interval-valued fuzzy (IVF)-environment. Considering that uncertainty is very common i...
متن کاملA Novel Suture Button Construct for Acute Ankle Syndesmotic Injuries; A Prospective Clinical and Radiological Analysis.
Background: The importance of the syndesmosis in ankle stability is well recognized. Numerous means of fixation have been described for syndesmotic injuries including the suture button technique. Significant cost limits the use the commercially available options. We, therefore, designed a cheap and readily available alternative construct. We aim to assess the results of using a novel suture-...
متن کاملA Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt
Estimating of the overhead costs of building construction projects is an important task in the management of these projects. The quality of construction management depends heavily on their accurate cost estimation. Construction costs prediction is a very difficult and sophisticated task especially when using manual calculation methods. This paper uses Artificial Neural Network (ANN) approach to...
متن کاملA Multi Objective Graph Based Model for Analyzing Survivability of Vulnerable Networks
In the various fields of disaster management, choosing the best location for the Emergency Support & Supply Service Centers (ESSSCs) and the survivability of the network that provides the links between ESSSCs and their environment has a great role to be paid enough attention. This paper introduces a graph based model to measure the survivability of the linking's network. By values computed for ...
متن کامل