Integrated maintenance and control policy based on quality control
نویسندگان
چکیده
In this paper, we develop a joint quality control and preventive maintenance policy for a production system producing conforming and non-conforming units. The considered system consists of one machine which must supply another production line operating on a just-in-time basis. According to the proportion l of non-conforming units observed on each lot and compared to a threshold value lm, one decides to undertake or not maintenance actions on the system. In order to palliate perturbations caused by the stopping of the machine to undergo preventive maintenance or an overhaul, a buffer stock h is built up from the instant when the rejection rate reaches a threshold level lA in order to ensure the continuous supply of the subsequent production line. Our objective is to determine simultaneously the optimal rates l m and l A, and the optimal size h * which minimize the expected total cost per time unit including the average costs related to maintenance, quality and inventory. 2009 Elsevier Ltd. All rights reserved.
منابع مشابه
Application of Multivariate Control Charts for Condition Based Maintenance
Condition monitoring is the foundation of a condition based maintenance (CBM). To relate the information obtained from the condition monitoring to the actual state of the system, it is usually required a stochastic model. On the other hand, considering the interactions and similarities that exist between CBM and statistical process control (SPC), the integrated models for CBM and SPC have been ...
متن کاملReliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System
In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...
متن کاملIntegration of the Decisions Associated with Maintenance Management and Process Control for a Series Production System
This paper studies a series production system through the integration of the decisions associated with Maintenance Management (MM) and Statistical Process Control (SPC). Hence, the primary question of the paper can be stated as follows: In a series production system, how can the decisions of MM and SPC be coordinated? To this end, an integrated mathematical model of MM and SPC is developed. Usi...
متن کاملAn economic-statistical model for production and maintenance planning under adaptive non-central chi-square control chart
Most of the inventory control models assume that quality defect never happens, which means production process is perfect. However, in real manufacturing processes, the production process starts its operation in the in-control state; but after a period of time, shifts to the out-of-control state because of occurrence of some disturbances. In this paper, in order to approach the model to real man...
متن کاملA Tabu Search Algorithm for Determining the Economic Design Parameters of an Integrated Production Planning, Quality Control and Preventive Maintenance Policy
In this work, an integrated model of economic production quantity, economic design of an -control chart, and preventive maintenance are investigated under non-uniform quality control parameters. The effect on the expected total cost and quality control cost is investigated with three different assumptions of the quality control parameters. Using a tabu seach algorithm, the optimal values of qua...
متن کاملIntegrated approach for maintenance and quality control for a multi-component system
In this paper, an integrated approach for maintenance and quality control is proposed for a multicomponent system.The model in this paper is based on the selective maintenance policy and a sampling procedure considering the economic design principle for quality control. The objective is to obtain a minimum cost solution with availability, allowable maintenance time and average time to signal as...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 58 شماره
صفحات -
تاریخ انتشار 2010