Comparison between Electrical and UHF PD Measurement concerning Calibration and Sensitivity for Power Transformers
نویسندگان
چکیده
The application of regular condition checks and continuous monitoring of power transformers gains in importance. Nowadays, these methods are frequently used to detect damages in the insulation system at early stage and thus to avoid outages. In addition to the electrical partial discharge (PD) measurement according IEC 60270 [1], the electromagnetic measurement method starts to become common practice. It is suitable for diagnostic measurement on-site and also as continuous PD monitoring system because of its lower sensitivity to external interference compared with the electrical measurement. For electrical PD measurement a calibration procedure for the ratio between capacitance of specimen and coupling capacitor is available. Although the actual PD charge still remains unknown, the associated comparability of electrical PD measurement systems has led to an acceptance level at transformer routine tests. A similar calibration of the electromagnetic UHF (ultra-high frequency: 300 MHz – 3 GHz) measurement has not been implemented yet, but is a necessity for further standardization of this method. This contribution compares both methods and takes a critical look at the established PD acceptance level. Therefore, the diagnostic value of the apparent charge measured according to IEC 60270 is discussed with regard to its dependency on the propagation path inside the winding and the frequency range of the measurement. Keywords—Partial Discharge (PD), Power Transformer, Sensitivity, Calibration, UHF, Apparent Charge
منابع مشابه
Calibration of UHF Partial Discharge Measurement for Power Transformers And a Comparison to the Calibration of Electrical PD Measurement
The reliability of electrical energy networks depends on the quality and reliability of its electrical equipment, e.g. power transformers. Local failures inside their insulation may lead to catastrophic breakdowns and may cause high outage and penalty costs. To prevent these destroying events, power transformers can be tested on partial discharge (PD) activity before commissioning and monitored...
متن کاملSuitability of Ultra High Frequency Partial Discharge Measurement for Quality Assurance and Testing of Power Transformers
Well known reasons for local failures in power transformers are caused by partial discharges (PD) in the electric insulation. Continuous deterioration over time increases the defect which finally can lead to a breakdown of the entire insulation. The importance of PD measurement is accommodated by standardized electrical measurement according to IEC 60270 [1] which is required for acceptance cer...
متن کاملبررسی عملکرد پروبهای UHF در آشکارسازی تخلیه جزئی در ترانسفورماتورهای فشار قوی
Recently, UHF partial discharge (PD) detection on power transformers attracts lots of attentions. For the transformers already installed in power network, the UHF signals can be captured only by UHF probes installed through oil drain valve. Although UHF probes are commercially produced, there are a lot of missing information on characteristics and features of these probes for PD detection. In t...
متن کاملUhf and Acoustic Partial Discharge Localisation in Power Transformers
The reliability of electrical energy networks depends on the quality and availability of electrical equipment like power transformers. Local failures inside their insulation may lead to catastrophic breakdowns and can cause high outage and penalty costs. Beside the strength and type of a PD, the geometric PD position is of major interest concerning risk evaluation of the flaw. Conventional PD m...
متن کاملPartial Discharge Monitoring of Power Transformers by UHF Sensors
The reliability of electrical energy networks depends on both, the quality and the reliability of its electrical equipment, e.g. power transformers. Local failures inside their insulation can lead to breakdowns and hence to high outage and penalty costs. Usually, power transformers are tested on partial discharge (PD) activity before commissioning. UHF PD monitoring can be used to prevent these...
متن کامل