Forecasting of Production Order Lead Time in Sme’s

نویسندگان

  • Tomaž Berlec
  • Marko Starbek
چکیده

More and more companies on the global market are today capable of manufacturing individual or small-series orders at comparable prices and quality. The main difference between these companies is the expected production order development-time and the observance of delivery deadlines. Before making a bid, the sales department must establish what operations will have to be carried out for a particular order, the time needed for performing these operations, and what delivery time is required. Currently, operation-time data are usually obtained from experienced company employees (however, a problem arises if they leave the company, because SMEs do not usually have systems for knowledge capture—the “knowledge" with which they are dealing is more "oral tradition", knowledge obtained by experience), while the customer specifies the delivery time. However, estimates on lead times, and thus delivery times, based on personal experience can be rather misleading. Bids may consequently be based on wrong decisions, or even worse; because of an incorrectly specified delivery time the company may not receive the order, because the delivery time (if not specified by the customer) may be too long and therefore uncompetitive in comparison with other bids. Another type of a problem arises if the specified delivery time is too short and cannot be met. The development of information and communication technologies (ICT) makes it easier for a company to improve and maintain its competitive advantages on the market (Leem C.S., Suh J.W., 2005), because it is very easy to access the data. A company striving to be competitive on the global market needs a suitable enterprise resource planning (ERP) system. There are several ERP systems available (Scherer E., 2005) and each company must select the optimal system for its needs (Starbek M., Grum J., 2000). This chapter presents how the data stored in the ERP system can be used for the calculation of lead times of operational and assembly orders and indirectly, for forecasting production order lead times, depending on the confidence interval. Naturally, if the company does not have an ERP system, it is possible to manually obtain the data required for forecasting lead times. The disadvantage of such a method is that the manual procedure is rather time-consuming in order to build an applicable database. The chapter presents a review of the literature and some achievements and guidelines related to lead times of orders and delivery times. A procedure for forecasting production

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A forecasting system by considering product reliability, POQ policy, and periodic demand

This paper presents an economic production quantity (EPQ) model with a periodic order quantity (POQ) policy, product reliability and periodic demand. The machine reliability has decreased over time; therefore, the rates of perfect and defective products reduce and increase over time, respectively. A fixed percentage of these products are reworked while the rest is wasted. Some equipment in thei...

متن کامل

Sales Budget Forecasting and Revision by Adaptive Network Fuzzy Base Inference System and Optimization Methods

The sales proceeds are the most important factors for keeping alive profitable companies. So sales and budget sales are considered as important parameters influencing all other decision variables in an organization. Therefore, poor forecasting can lead to great loses in organization caused by inaccurate and non-comprehensive production and human resource planning. In this research a coherent so...

متن کامل

A NEW APPROACH BASED ON OPTIMIZATION OF RATIO FOR SEASONAL FUZZY TIME SERIES

In recent years, many studies have been done on forecasting fuzzy time series. First-order fuzzy time series forecasting methods with first-order lagged variables and high-order fuzzy time series forecasting methods with consecutive lagged variables constitute the considerable part of these studies. However, these methods are not effective in forecasting fuzzy time series which contain seasonal...

متن کامل

Optimization of two-stage production/inventory systems under order base stock policy with advance demand information

It is important to share demand information among the members in supply chains. In recent years, production and inventory systems with advance demand information (ADI) have been discussed, where advance demand information means the information of demand which the decision maker obtains before the corresponding actual demand arrives. Appropriate production and inventory control using demand info...

متن کامل

Optimal Relief Order Quantity under Stochastic Demand and Lead-time

In this paper, a newsboy model is developed under uniformly distributed lead-time and demand that is an appropriate assumption in obtaining optimal relief inventory of humanitarian disasters. It is noteworthy that limited historical data are in hand on relief operations. Hence, analytical and approximate solutions for optimal relief order quan­tity were derived. The effect of lead-time uncertai...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012