Multitask and Multistage Production Planning and Scheduling for Process Industries
نویسندگان
چکیده
We consider the planning and scheduling of production in a multitask/multistage batch manufacturing process typical of industries such as chemical manufacturing, food processing, and oil refining. We allow instances in which multiple sequences of tasks may be used to produce end products. We formulate the problem as a mixed-integer linear program and show that the linear programming relaxation has a large integrality gap and requires significant computational effort to solve to optimality for large instances. Using echelon inventory, we construct a new family of valid inequalities for this problem. The formulation with the additional constraints leads to a significantly tighter linear programming relaxation and to greatly reduced solution times for the mixed-integer linear program.
منابع مشابه
یکپارچه سازی برنامهریزی و زمانبندی تولید در صنایع فرآیندی چند محصولی با سیستم تولیدی پیوسته
One of the main elements of each supply chain is production. Production planning in multi-products process industries in which products are subjected to the complicated operational constraints is a very hard work because production of computed optimal volume should be compatible with operation scheduling constraints of production system. Thus, integration idea has been proposed for required d...
متن کاملMachine scheduling for multitask machining
Multitasking is an important part of today’s manufacturing plants. Multitask machine tools are capable of processing multiple operations at the same time by applying a different set of part and tool holding devices. Mill-turns are multitask machines with the ability to perform a variety of operations with considerable accuracy and agility. One critical factor in simultaneous machining is to cre...
متن کاملExact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملProduction Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries
This study is conducted to developed innovative production planning and control strategies to manufacturing industries so as to improve production performance and competitiveness of basic metal sectors Though the study was conducted through field observation and questioner used as primary data and literature review on research articles, books, and electronic-sources which used as secondar...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Operations Research
دوره 56 شماره
صفحات -
تاریخ انتشار 2008