Reconcile sequence improvement projects

نویسنده

  • Wilson Leung
چکیده

Introduction This document describes the strategies for reconciling a GEP sequence improvement project that has been improved by multiple students. The reconciliation process seeks to generate the most accurate sequence assembly possible by comparing the multiple assemblies. Discrepant regions among the different assemblies can help the reviewer identify problematic regions in the assembly that merit further examination during the quality assurance (QA) process.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improvement in Europe : Potential of the New V - Modell XT and Research Issues Practice Section

The goal of European industrial practice to support high-value software production in diversified domains has led to the development of a huge number of process model variants. However, these diverse models are hard to compare, which hinders efficient collaboration and software process improvement on a European level. Process managers see a growing need for approaches that support stakeholder c...

متن کامل

Investigation of the Productivity of Networking Activities and Improvement Projects on the Sales and Employment of Iranian Agricultural Clusters

O ne of the effective strategies for economic development of clusters is the conduct of networking activities by cluster members. Indeed, the majority of cluster members are micro and small enterprises, so, should attempt to overcome their inherent constraints and influence the market through networking activities. In addition, these enterprises lack an intra-firm research and develo...

متن کامل

Assessment of Improvement of Preventive Maintenance Systems Related to the Civil Projects Using Concepts of Value Engineering (RESEARCH NOTE)

The purpose of this paper is using the concepts of value engineering (VE) in evaluating the improvement caused by preventive maintenance (PM) systems in construction project. A real case is used to show how we can implement the proposed method. VE is the systematic application of recognized techniques by multi-disciplined teams that identifies the function of a product or service, establishes a...

متن کامل

A game theoretic approach to decentralized multi-project scheduling

In this paper we demonstrate how decentralized multi-project scheduling problems can be solved efficiently by a group of project manager agents playing a simple sequence learning game. In the multi-project scheduling problem, multiple projects, each having a number of activities, must be scheduled. A set of local and global resources are available for carrying out the activities of the projects...

متن کامل

The pioneering use of ISSR (Inter Simple Sequence Repeat) in Neotropical anurans: preliminary assessment of genetic diversity in populations of Physalaemus cuvieri (Amphibia, Leiuperidae).

The greatest diversity of anurans in the world is in Brazil and one of the major challenges is to reconcile the accelerated economic development with strategies that aim to maintain this diversity in forest fragments, often representing ESUs of some biomes. This study aimed to obtain data that will support conservation projects through the pioneering use of ISSR analysis in Neotropical anurans,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013