Loss of customer goodwill in the uncapacitated lot-sizing problem

نویسنده

  • Deniz Aksen
چکیده

Loss of customer goodwill in uncapacitated single level lot-sizing is studied with a mixed integer programming model extending the well-known Wagner-Whitin (WW) model. The objective is to maximize profit from production and sales of a single good over a finite planning horizon. Demand, costs, and prices vary with time. Unsatisfied demand cannot be backordered. It leads to the immediate loss of profit from sales. Previous models augment the total cost objective by this lost profit. The difference of the proposed model is that unsatisfied demand in a given period causes the demand in the next period to shrink due to the loss of customer goodwill. A neighborhood search and restoration heuristic is developed that tries to adjust the optimal lot sizes of the original no-goodwill-loss model to the situation with goodwill loss. Its performance is compared with the Wagner-Whitin solution, and with the commercial solver CPLEX 8.1 on 360 test problems of various period lengths.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncapacitated lot-sizing problem with production time windows, early production, backlog and lost sale

We consider the single item uncapacitated lot-sizing problem with production time windows, lost sale, early production and backlog over a planning horizon of T periods. In this context, a demand not processed within its time window can either be lost (lost sale), satisfied from a production that is processed before the release period of the demand (early production) or satisfied from a producti...

متن کامل

Capital flow constrained lot sizing problem with loss of goodwill and loan

We introduce capital flow constraints, loss of good will and loan to the lot sizing problem. Capital flow constraint is different from traditional capacity constraints: when a manufacturer launches production, its present capital should not be less than its present total production cost; otherwise, it must decrease production quantity or suspend production. Unsatisfied demand in one period may ...

متن کامل

Simultaneous Due Date Assignment and Lot Sizing with Uncertain Flow Times

Due date assignment for customer orders has been studied in various productionenvironments using different modeling approaches. In this paper the researchers consider aproduction system in which the orders of several customers are produced in a single batch because ofthe economy of scale. If a batch is completed before receiving customer orders, inventory carryingcost is incurred but if it is c...

متن کامل

A branch-and-cut algorithm for the stochastic uncapacitated lot-sizing problem

This paper addresses a multi-stage stochastic integer programming formulation of the uncapacitated lot-sizing problem under uncertainty. We show that the classical (`, S) inequalities for the deterministic lot-sizing polytope are also valid for the stochastic lot-sizing polytope. We then extend the (`, S) inequalities to a general class of valid inequalities, called the (Q, SQ) inequalities, an...

متن کامل

Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain

The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 34  شماره 

صفحات  -

تاریخ انتشار 2007