In the tunnel construction, due to the limitation of the survey and design and the complex dynamics of tunnel surrounding rock geological conditions, so it is difficult for complex geology with the microscopic accurate grasp, often which caused by geological exploration data do not tally with the actual situation, often encountered in karst water inrush, large deformation in weak rock, cave-in subsidence, geological hazards, such as gas outburst, rock burst cause person casualties, delays, in order to minimize geological disaster influence degree, advanced geological prediction before construction is very necessary. Using regression analysis, based on engineering vault subsidence and horizontal convergence has carried on the regression analysis, research results can be reference for related engineering design and construction. Detailed introduces the principle, methods and outstanding characteristic of tunnel reflection tomography advanced prediction system, and take Jianfengling mountain tunnel of Darui line railway as an example, the prediction results are analyzed in detailed processing, and on-site validation, finally points out the problem for further study the technology.
منابع مشابه
Study on Application of Electromagnetic Tomography Advanced Geological Prediction in Tunnel Construction
With the large-scale construction and rapid development of underground engineering, a large number of underground engineering construction, such as tunnel and subway emerged. The geological structure of the tunnel is complex and the roc is fragmented. The electromagnetic tomography is a new geophysical technique in the tunnel. This method has advantages such as high resolution, high reliability...
متن کاملTUNNEL BORING MACHINE PENETRATION RATE PREDICTION BASED ON RELEVANCE VECTOR REGRESSION
key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there ...
متن کاملGeological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)
Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...
متن کاملTunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study
The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great complexity in an area high potential for sliding and water-bearing fault which has made the excavati...
متن کاملEvaluation of TBM Utilization Using Rock Mass Rating System: A Case Study of Karaj-Tehran Water Conveyance Tunnel (Lots 1 and 2)
Successful application of a TBM in a project requires investigating both the ground conditions and the machine and backup system design features. Prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. In this respect, both penetration rate and advance rate must be estimated. Utilization factor, which depends on the type of op...