Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling
نویسندگان
چکیده
Beam search (BS) is used as a heuristic to solve various combinatorial optimization problems, ranging from scheduling to assembly line balancing. In this paper, we develop a backtracking and an exchange-of-information (EOI) procedure to enhance the traditional beam search method. The backtracking enables us to return to previous solution states in the search process with the expectation of obtaining better solutions. The EOI is used to transfer information accumulated in a beam to other beams to yield improved solutions. We developed six different versions of enhanced beam algorithms to solve the mixed-model assembly line scheduling problem. The results of computational experiments indicate that the backtracking and EOI procedures that utilize problem specific information generally improve the solution quality of BS. 2007 Elsevier B.V. All rights reserved.
منابع مشابه
A Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect
Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...
متن کاملOne-Dimensional Modeling of Helicopter-Borne Electromagnetic Data Using Marquardt-Levenberg Including Backtracking-Armijo Line Search Strategy
In the last decades, helicopter-borne electromagnetic (HEM) method became a focus of interest in the fields of mineral exploration, geological mapping, groundwater resource investigation and environmental monitoring. As a standard approach, researchers use 1-D inversion of the acquired HEM data to recover the conductivity/resistivity-depth models. Since the relation between HEM data and model ...
متن کاملNew Formulation and Solution in PCB Assembly Systems with Parallel Batch processors
This paper considers the scheduling problem of parallel batch processing machines with non-identical job size and processing time. In this paper, a new mathematical model with ready time and batch size constraints is presented to formulate the problem mathematically, in which simultaneous reduction of the makespan and earliness-tardiness is the objective function. In recent years, the nature-in...
متن کاملOptimisation of assembly scheduling in VCIM systems using genetic algorithm
Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...
متن کاملGeneralized Cyclic Open Shop Scheduling and a Hybrid Algorithm
In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 186 شماره
صفحات -
تاریخ انتشار 2008