A study of availability-centered preventive maintenance for multi-component systems

نویسندگان

  • Yuo-Tern Tsai
  • Kuo-Shong Wang
  • Lin-Chang Tsai
چکیده

This paper studies preventive maintenance (PM) in simultaneously considering three actions, mechanical service, repair and replacement for a multi-components system based on availability. Mechanical service denotes the activities including lubricating, cleaning, checking and adjusting, etc. which is set to alleviate strength degradation. Repair is defined on that not only slow down the degraded velocity but also restore the degraded strength partly. Replacement is settled to recover a component to its original condition. According to the definitions, the degradation of components is analyzed from its failure mechanisms and the improvements of various actions to it in reliability were measured by using two improved factors. Following the proposed model of reliability, the mean-up and mean-down times of each component are also investigated and the replacement intervals of components are determined based on availability maximization. Here, the minimum one among the intervals is chosen as the PM interval of system for programming the periodical PM policy. The selection of action for the components on every PM stage is decided by maximizing system benefit in maintenance. Repeatedly, the scheduling is progressed step by step and is terminated until the system extended life reaching to its expected life. The complete schedule provides the information, the actions adopted for the components, the availability and the total cost of system on each stage. Validly, a multi-components system is used as an example to describe the proposed algorithm. q 2003 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems

General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance cost. The cost function of a maintenance policy was minimized under given availability constraint. On the other hand, in order to ensure appropriate reliability and availability, the development of the optimal maintenanc...

متن کامل

A New multi attribute Decision making Reliability Centered Maintenance in Power Transmission Systems

The present context of the electric industry, characterized by competitive markets, privatization, and regulatory of technical requirements forces the power utilities to optimize their asset management practices and develop the requisite decision plans techno-economically. Practically approaching, this paper devises a new support tool based on a multiattribute decision making (MADM) framework i...

متن کامل

An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system

Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...

متن کامل

Two echelon-two indenture extended warranty distribution network under imperfect preventive maintenance policies

Nowadays, offering extended warranty is considered as a lucrative source of income from the perspective of the after-sale service providers. Meanwhile, the main concern is presence or absence of base warranty and strategies adopted by the manufacturer during this period. Moreover, extended warranty structure must be responsive and customer oriented, which not only control the services cost but ...

متن کامل

Assessment of Improvement of Preventive Maintenance Systems Related to the Civil Projects Using Concepts of Value Engineering (RESEARCH NOTE)

The purpose of this paper is using the concepts of value engineering (VE) in evaluating the improvement caused by preventive maintenance (PM) systems in construction project. A real case is used to show how we can implement the proposed method. VE is the systematic application of recognized techniques by multi-disciplined teams that identifies the function of a product or service, establishes a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Rel. Eng. & Sys. Safety

دوره 84  شماره 

صفحات  -

تاریخ انتشار 2004