A Net Practice for Software Project Management
نویسندگان
چکیده
activity (b) Product (c) Acute scenario analysis Constraint (e) C1 Acute user's manual
منابع مشابه
Project resource investment problem under progress payment model
As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...
متن کاملImplementation of Best-Practice Software-Engineering Setup in .net Application Development
The ever increasing complexity of contemporary software products advise the application of stateof-the-art software engineering techniques. However, the setup, configuration and implementation in the project team is a demanding task. This paper acts as a guideline through the forest of several important aspects of software development as there are: daily builds using automated testing, black bo...
متن کاملA Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)
Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملTowards Measuring the Project Management Process During Large Scale Software System Implementation Phase
Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IEEE Software
دوره 16 شماره
صفحات -
تاریخ انتشار 1999