Fast error estimates for indirect measurements: applications to pavement engineering

نویسندگان

  • Carlos Ferregut
  • Soheil Nazarian
  • K. Vennalaganti
  • C.-C. Chang
  • Vladik Kreinovich
چکیده

In ninny real-life situations, we have the fi~llowing problen|: we want it) know the vahle ~)f ~)n|e characteristic U that is diffiodt to measure directly (e.g., lifetin|e of a pavement, effidency of an engine, etc.). To esti|mate U, we mug know the relationship between 9 and aane directly measurable physical quamities X h . . . , xn. Fro|n this relationship, we extract an algorithm f that alh|ws us, given xi, to cmnpute p: 9 ---f ( x l . . . . ,xa). &~, we measure zi , apply an algorithm f , and get the d~sired estimate. Existing algorithms fi~r err .r ~timate (interval nmthematics, Monte-Carlo methods, nun|eri~l differentiadon, etc.} require cmnputation dine that is several times larger than the time necessary to compute Y = f ( x h . . . , x a ) . So, if an algorithm f is already time-consuming, error estimates will take t(x~ hmg. In ,many cases, this algorithm f consists of two parts: first, we use xi to determine the parameters zk of a nuMel that describes the measured object, and seomd, we use these parameters to estimate Y. The most tin|e-consunfing part is finding zk; this is done by ~dving a system of ram-linear equatkms; usually least squares method is used. We show that for such f , one can estimate errors repeating this time~msu|ning part of f only once. So, we can omlpute |xgh y and an em)r estimate fi,r U with practically m~ increase in total con|putadon dine. As an example of this m~htgtology, we give pavement lifetime estimates.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Neural Networks Analysis of Airfield Pavement Heavy Weight Deflectometer Data

The Heavy Weight Deflectometer (HWD) test is one of the most widely used tests for assessing the structural integrity of airport pavements in a non-destructive manner. The elastic moduli of the individual pavement layers predicted from the HWD deflection measurements through inverse engineering analysis are effective indicators of pavement layer condition. The primary objective of this study wa...

متن کامل

Use of Modal Interval Analysis in Early Engineering Design

Direct and indirect measurements: uncertainty is ubiquitous. In practice, how do we obtain the numerical values of different physical quantities? For some quantities, we can obtain these values directly, either by performing a measurement or by eliciting the value from an expert. Measurements are never absolutely accurate; as a result, the result x̃ of the measurement is somewhat different from ...

متن کامل

Estimation the Fatigue Number of Stone Mastic Asphalt Mixtures Modified with Nano SiO2 and Nano TiO2

Asphalt modification/reinforcement has received considerable attention as viable solutions to enhance flexible pavement performance. This is mainly prompted by the unsatisfactory performance of traditional road materials exposed to dramatic increases and changes in traffic patterns. This paper presents the evaluation of fatigue behaviour of nano reinforced Stone Mastic Asphalt mixtures. Fatigue...

متن کامل

A New Non-linear Control of the Four-Leg Inverter with Decoupled Model and Fast Dynamic Response for PV Generation Systems

Distributed generation (DG) will play an important role in future power generation systems, especially in stand-alone applications. Three phase four-leg inverter is a well-known topology which can be used as an interface power converter for DGs. Thanks to the fourth leg to provide the neutral path, the four-leg inverter is able to supply balanced loads as well as unbalanced loads. In this paper...

متن کامل

Model Predictive Inferential Control of a Distillation Column

Typical production objectives in distillation process require the delivery of products whose compositions meet certain specifications. The distillation control system, therefore, must hold product compositions as near the set points as possible in faces of upset. In this project, inferential model predictive control, that utilizes an artificial neural network estimator and model predictive cont...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Reliable Computing

دوره 2  شماره 

صفحات  -

تاریخ انتشار 1996