Excessive Long-Time Deflections of Prestressed Box Girders. I: Record-Span Bridge in Palau and Other Paradigms

نویسندگان

  • Zdeněk P. Bažant
  • Qiang Yu
  • Guang-Hua Li
چکیده

The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had a record span of 241 m (791 ft), presents a striking paradigm of serviceability loss because of excessive multidecade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, this girder developed a midspan deflection of 1.61 m (5.3 ft) compared with the design camber after 18 years, and it collapsed in 1996 as a consequence of remedial prestressing, after a 3-month delay. Compared with three-dimensional analysis, the traditional beam-type analysis of box girder deflections is found to have errors up to 20%, although greater errors are likely for bridges with higher box-width-to-span ratios than the KB Bridge. However, even three-dimensional finite-element analysis with step-by-step time integration cannot explain the observed deflections when the current American Concrete Institute, Japan Society of Civil Engineers, Comité Euro-International du Béton (or Comité EuroInternational du Béton—Fédération internationale de la précontrainte), and Gardner and Lockman prediction models for creep and shrinkage are used. These models give 18-year deflection estimates that are 50–77% lower than measured and yield unrealistic shapes of the deflection history. They also predict the 18-year prestress loss to be 46–56% lower than the measured mean prestress loss, which was 50%. Model B3, which is the only theoretically based model, underestimates the 18-year deflection by 42% and gives a prestress loss of 40% when the default parameter values are used. However, in Model B3, several input parameters are adjustable and if they are adjusted according to the long-time laboratory tests of Brooks, a close fit of all the measurements is obtained. For early deflections and their extrapolation, it is important that Model B3 can capture realistically the differences in the rates of shrinkage and drying creep caused by the differences in the thickness of the walls of the cross section. The differences in temperature and possible cracking of the top slab also need to be taken into account. Other paradigms on which data have recently been released are four bridges in Japan and one in the Czech Republic. Their excessive deflections can also be explained. The detailed method of analysis and the lessons learned are presented in Part II. DOI: 10.1061/(ASCE)ST.1943-541X .0000487. © 2012 American Society of Civil Engineers. CE Database subject headings: Creep; Shrinkage; Box girders; Serviceability; Deflection; Span bridges. Author keywords: Prestressed box girder; Bridges; Segmental erection; Shear lag; Design standards; Concrete; Relaxation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Excessive Long-Time Deflections of Prestressed Box Girders

The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had the record span of 241 m (791 ft.), presents a striking paradigm of serviceability loss due to excessive multi-decade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, thi...

متن کامل

Explanation of Excessive Long-Time Deflections of Collapsed Record-Span Box Girder Bridge in Palau

Explanation of the excessive deflections of the Koror-Babeldaob (KB) Bridge in Palau is presented. This bridge was built in 1977 by the cantilever method and collapsed 3 months after remedial prestressing in 1996. It was a segmental prestressed concrete girder having the worldrecord span of 241 m (790 ft.) and maximum girder depth of 14.17 m (46.5 ft). The final mid-span deflection was in desig...

متن کامل

Research Record, RR-102

Since the 1950’s, prestressed concrete beams have become a factor in almost one third of all new bridge construction in the United States. In Michigan, prestressed concrete was introduced in 1954 and the first prestressed concrete side-by-side box-beam bridge was built in 1955. Pontis data indicates 2,054 side-by-side prestressed concrete box-beam bridges in Michigan; 236 are part of the Nation...

متن کامل

Construction of Nagisa Bridge Hybrid System of Cable-stayed Pc Bridge and Steel Suspension Bridge

Nagisa Bridge, a single span footbridge, was recently completed in Aomori prefecture, Japan. The structure of this bridge is a hybrid structure of cable-stayed prestressed concrete bridge and steel suspension bridge. It is the first application as this structure type of bridge in the world. Concrete girders near pylons are supported by stay cables. Steel girders are supported by suspension cabl...

متن کامل

Shear Strengthening Using Frp Sheets for a Idghw a Y Bridge in Manitoba, Canada

The use of heavier trucks demanded upgrading of a twenty-seven year old bridge in Winnipeg, Manitoba, Canada. Analysis of the precast prestressed concrete girders using the current AASHTO Code indicates a deficiency in the shear capacity. Shear strengthening using Carbon Fibre R_einforced Polymer (CFRP) sheets provides a low-cost solution by increasing the speed of construction and reducing tra...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012