A Min-Flow Algorithm for Minimal Critical Set Detection in Resource Constrained Project Scheduling
نویسندگان
چکیده
We propose a min-flow algorithm for detecting Minimal Critical Sets (MCS) in Resource Constrained Project Scheduling Problems (RCPSP). The MCS detection is a fundamental step in the Precedence Constraint Posting method (PCP), one of the most successful approaches for the RCPSP. The proposed approach is considerably simpler compared to existing flow based MCS detection procedures and has better scalability compared to enumerationand envelopebased ones, while still providing good quality Critical Sets. The method is suitable for problem variants with generalized precedence relations or uncertain/variable durations.
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملAn Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملA Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...
متن کاملAN EXPERIMENTAL INVESTIGATION OF THE SOUNDS OF SILENCE METAHEURISTIC FOR THE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH PRE-OPTIMIZED REPERTOIRE ON THE HARDEST MMLIB+ SET
This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...
متن کاملDetecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Artif. Intell.
دوره 182-183 شماره
صفحات -
تاریخ انتشار 2012