Design and Development of the Vacuum Systems for the Apt Project Ed&d Cryomodule

نویسندگان

  • G. Hansen
  • K. Kishiyama
  • S. Shen
  • P. V. Shoaff
چکیده

The mechanical design for both the insulating vacuum system and the cavity vacuum system of the APT ED&D Cryomodule is summarized. The pre-cooldown pressure limits for the insulating vacuum and the cavity vacuum are 10 -5 Torr and 10 -6 Torr, respectively. In addition, the cold cavity operating pressure limits are 10 -6 Torr for the insulating system and 10 -8 Torr for the cavity system. The designs of these systems utilize both turbomolecular pumps and the cold surfaces of the superconducting Nb cavities to arrive at and maintain their operating vacuum pressures. A synopsis of the analysis undertaken to predict the vacuum system performance is also presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Performance Appraisal of Research and Development Projects Value-Chain for Complex Products and Systems: The Fuzzy Three-Stage DEA Approach

The purpose of the current research is to provide a performance appraisal system capable of considering the value chain network structure of research and development (R&D) projects for Complex products and systems (CoPS) under uncertainty of data. Therefore, in order to achieve this goal, a network data envelopment analysis (NDEA) approach and the possibilistic programming to provide a new fuzz...

متن کامل

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

System Engineering Implementation Process for Super-Systems

System engineering is one of the most powerful tools for comprehensive project management and control. This tool emphasized the life cycle of the projects, manages every single activity and helps manage the main elements of the project through a set of management and engineering processes. The goal of the current study is to use a system engineering approach in design phase in order or to meet ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999