Transmission congestion management in bilateral markets: An interruptible load auction solution

نویسندگان

  • Le Anh Tuan
  • Kankar Bhattacharya
  • Jaap Daalder
چکیده

This paper demonstrates that appropriate invocation of interruptible loads by the independent system operator (ISO) can aid in relieving transmission congestion in power systems. An auction model is proposed, for an ISO operating in a bilateral contract dominated market, for real-time selection of interruptible load offers while satisfying the congestion management objective. The proposed congestion management scheme using interruptible loads can specifically identify load buses where corrective measures are needed for relieving congestion on a p t n ©

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum Proposal of Various Financial Rights in Secondary Short-Period Auction Market of Transmission Rights for Congestion Risk Management

Congestion Risk Management is one of the most important subjects of Transmission management in deregulated power system and world electricity market, especially markets of zonal or local pricing in which Firm Transmission Rights (in other words Financial Transmission Rights) are the main elements. In this study, considering subjects of Financial Rights of Transmission Congestion, methods of opt...

متن کامل

Deregulated Power Markets

Since the nineties decade, many electric utilities world-wide have been restructuring their systems from vertically integrated functioning to deregulated open-market ones. In the erstwhile vertically integrated utilities, the system operator sought to maximize the social welfare with distributional equity (meeting the load at all time) as the main criteria, for the system as a whole. The operat...

متن کامل

Unit Commitment Considering Position of Interruptible Load in Energy and Reserve Simultaneous Market

In this paper security constrained unit commitment (SCUC) is employed for simultaneous clearing of energy and reserve markets. Spinning reserve of production units and interruptible loads (IL) are used as system operation reserve. Some restrictions on the use of interruptible loads, such as maximum load curtailed, maximum curtailment hour in a day, maximum length of each curtailment are also co...

متن کامل

Firefly Technique Based on Optimal Congestion Management in an Electricity Market

Nowadays, congestion management is one of the major tasks accomplished by system operators to warrant the operation of transmission system within operating limits. This has resulted in unanticipated congestion interfaces in regional transmission systems. The system is, however, unable to evolve at a rate which is required to meet the quickly changing demand of competitive markets. To make the m...

متن کامل

Firefly Technique Based on Optimal Congestion Management in an Electricity Market

Nowadays, congestion management is one of the major tasks accomplished by system operators to warrant the operation of transmission system within operating limits. This has resulted in unanticipated congestion interfaces in regional transmission systems. The system is, however, unable to evolve at a rate which is required to meet the quickly changing demand of competitive markets. To make the m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004