Effects of Hard Real-Time Constraints in Implementing the Myopic Scheduling Algorithm
نویسندگان
چکیده
Myopic is a hard real-time process scheduling algorithm that selects a suitable process based on a heuristic function from a subset (Window) of all ready processes instead of choosing from all available processes, like original heuristic scheduling algorithm. Performance of the algorithm significantly depends on the chosen heuristic function that assigns weight to different parameters like deadline, earliest starting time, processing time etc. and the size of the Window since it considers only processes from processes (where, k n n k ≤ ). This research evaluates the performance of the Myopic algorithm for different parameters to demonstrate the merits and constraints of the algorithm. A comparative performance of the impact of window size in implementing the Myopic algorithm is presented and discussed through a set of experiments. Keywords-Original scheduling algorithm, Myopic algorithm, window size, earliest starting time, processing time, deadline of a process, dispatch queue, heuristic function.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملDevelopment of Model and Algorithm for Depot Balancing Multi-Depot Vehicle Scheduling Problem Considering Depot Balancing
The main of multi-depot vehicle scheduling problem (MDVSP) is to schedule the timetabled trips using limited resources, optimally. The problem is very important in the management of the transportation systems. One of the most useful ways to better manage these systems is to consider the real conditions including depot balancing constraints. To normalize the number of vehicles departed from each...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1407.0122 شماره
صفحات -
تاریخ انتشار 2007