An Optimum Algorithm for Cut-off Grade Calculation Using Multistage Stochastic Programming
نویسندگان
چکیده
Cut-off grade is one of the very important technical and economic parameters, which affects the economic and social efficiency in a mine enterprise. It is also the basis of the deposits technical economy evaluation, feasibility study, mining planning and design and the foundation of the decision-making in mining investment. Thereby, cut-off grade optimization is one of the core contents and therefore the key parameter in mine mining, management and decision. The optimized determination of cut-off grade in mine mining involves complex analysis and scientific calculation, which is tightly related to economic management, ore dressing, mining, geology, applied mathematics and computer knowledge subjects. In this paper, we modeled the cut-off grade optimization problem as a multistage stochastic programming issue. In the proposed stochastic programming model, each ore grade in a given ore body is a random variable following a distribution. And a mathematical model for selecting an optimum cut-off grade function was constructed, which aimed at the maximization of total present value of an open pit. Experimental results show that the proposed algorithm for cut-off grade optimization is efficiency.
منابع مشابه
Comparison of golden section search method and imperialist competitive algorithm for optimization cut-off grade- case study: Mine No. 1 of Golgohar
Optimization of the exploitation operation is one of the most important issues facing the mining engineers. Since several technical and economic parameters depend on the cut-off grade, optimization of this parameter is of particular importance. The aim of this optimization is to maximize the net present value (NPV). Since the objective function of this problem is non-linear, three methods can b...
متن کاملThe effect of price changes on optimum cut-off grade of different open-pit mines
Maximizing economic earnings is the most common goal in cut-off grade optimization of open-pit mining operations. When this is the case, the price of the product has a critical effect on optimum value of cut-off grade. This paper investigates the relationship between optimum cut-off grade and price to maximize total cash flow and net percent value (NPV) of operation. In order to visualize this ...
متن کاملCut-off Grade Optimization for Maximizing the Output Rate
In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...
متن کاملChoosing the Optimum Underground Mine Layout with Regard to Metal Price Uncertainty Using Expected Utility Theory
Metal price is one of the most important parameters in the calculation of cut- off grade. The cut- off grade has the main role in determination of mine layout. Mine layout actuates mineable reserve, mine life and economic profitability. Not considering the uncertainty in metal prices can lead to a non-optimal layout. In this paper optimum underground mine layout is determined by expected utilit...
متن کاملRelationship between the optimum cut off frequency for Butterworth filter and lung-heart ratio in 99mTc myocardial SPECT
Background: We investigated whether the lungheart ratio parameter (LHR) can be used to identify the optimum cut off frequency for Butterworth filter in 99mTc myocardial SPECT imaging. Materials and Methods: This study involved a cardiac phantom system consisting of cardiac insert in which 1.10 cm cold defect was inserted into its myocardium wall and filled with 4.0 μCi/ml (0.148 MBq/ml...
متن کامل