The economic lot-sizing problem with an emission constraint
نویسندگان
چکیده
We consider a generalisation of the lot-sizing problem that includes an emission constraint. Besides the usual financial costs, there are emissions associated with production, keeping inventory and setting up the production process. Because the constraint on the emissions can be seen as a constraint on an alternative cost function, there is also a clear link with bi-objective optimisation. We show that lot-sizing with an emission constraint is NP-hard and propose several solution methods. First, we present a Lagrangian heuristic to provide a feasible solution and lower bound for the problem. For costs and emissions for which the zero inventory property is satisfied, we give a pseudo-polynomial algorithm, which can also be used to identify the complete Pareto frontier of the bi-objective lotsizing problem. Furthermore, we present a fully polynomial time approximation scheme (FPTAS) for such costs and emissions and extend it to deal with general costs and emissions. Special attention is paid to an efficient implementation with an improved rounding technique to reduce the a posteriori gap, and a combination ∗Corresponding author, e-mail: [email protected]
منابع مشابه
A New model for integrated lot sizing and scheduling in flexible job shop problem
In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...
متن کاملModeling and Analyzing Incremental Quantity Discounts in Transportation Costs for a Joint Economic Lot Sizing Problem
Joint economic lot sizing (JELS) addresses integrated inventory models in a supply chain. Most of the studies in this field either do not consider the role of the transportation cost in their analysis or consider transportation cost as a fixed part of the ordering costs. In this article, a model is developed to analyze an incremental quantity discount in transportation cost. Appropriate equatio...
متن کاملJOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME
In this study, a two-echelon supplier-manufacturer system with finite production rate and lead time is proposed. It is assumed that shortage is not permitted and the lot size of manufacturer (second echelon) is m-factors of the lot size of supplier (first echelon) and supplier can supply the manufacturer’s lot size in several shipments in each cyc...
متن کاملIncorporating Return on Inventory Investment into Joint Lot-Sizing and Price Discriminating Decisions: A Fuzzy Chance Constraint Programming Model
Coordination of market decisions with other aspects of operations management such as production and inventory decisions has long been a meticulous research issue in supply chain management. Generally, changes to the original lot-sizing policy stimulated by market prices may impose remarkable deviation revenue throughout the supply and demand chain system. This paper examines how to set the chan...
متن کاملEconomic Lot Sizing and Scheduling in Distributed Permutation Flow Shops
This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be d...
متن کامل