The Analytic Hierarchy Process and Data-less Prediction
نویسندگان
چکیده
Building useful effort prediction systems for software engineering projects is difficult in the absence of historical data. To overcome this problem we propose the use of Saaty’s Analytic Hierarchy Process (AHP) to elicit subjective expert opinion using pairwise comparisons. We briefly describe the theory of AHP and then outline how it might be harnessed to overcome a lack of historical data. Two case studies, using data from BT and another telecommunications company, illustrate the method’s potential. If all the comparisons are correctly made, extremely accurate results are possible (of the order of mean magnitude of relative errors (MMRE) =5%). The approach is also very tolerant to incorrect comparisons: even when 40% of all comparisons are randomised, the accuracy is still much better than a linear regression model or expert judgement. Next we describe a simple pilot study which indicates that project managers are capable of making the pairwise judgements our method requires. We then consider some problems that need to be overcome before this approach can easily be deployed. These include lack of homogeneity in the elements being compared and excessive numbers of comparisons. We believe this novel effort prediction approach has given encouraging results and warrants further investigation.
منابع مشابه
Analysis of the Utility of Economic Sectors in Achieving Agricultural Development: Applying an Analytic Hierarchy Process
ABSTRACT- According to article 44 of the I.R. of Iran Constitution, the Iranian economy consists of three sectors; the state, the cooperative, and the private sectors. The aim of this study was to present a hierarchy of criteria for selecting the best economic sector for agricultural development. Analytic Hierarchy Process (AHP) was used to calculate the relative importance of either criteria o...
متن کاملSupplier selection in the sustainable supply chain: The application of analytic hierarchy process and fuzzy data envelopment analysis
The development and management of an effective and efficient supply chain involve the selection of the suppliers. Only economic criteria, including cost and delivery, once used to be considered in the process of supplier selection. But, they do not suffice for the evaluation of suppliers anymore due to the rapidly changing environment, and different perspectives are needed to be considered. The...
متن کاملFramework for Prioritizing Solutions in Overcoming Data Quality Problems Using Analytic Hierarchy Process (AHP)
The Central Statistics Agency (BPS) is a government institution that has the authority to carry out statistical activities in the form of censuses and surveys, to produce statistical data needed by the government, the private sector and the general public, as a reference in planning, monitoring, and evaluation of development results. Therefore, providing quality statistical data is very decisiv...
متن کاملApplication of multi-criteria decision making to estimate the potential of flooding
Integrating a geographic information system and multi-criteria decision making methods have been lead to provide spatial multi-criteria decision making methods. In this study, the spatial potential of flooding was determined based on analytic network process and analytic hierarchy process. At first, six factors of flooding were determined as criteria. The criteria were the slope, hill-slope asp...
متن کاملDouble-Frontier Analysis Approach for Weight Derivation in Analytical Hierarchy Process
Data Envelopment Analysis (DEA) combined with Analytic Hierarchy Process (AHP) provides Data Envelopment Analytic Hierarchy Process (DEAHP) methodology for weight derivation and aggregation. A double-frontier analysis approach is proposed in this article to derive priorities in AHP. The proposed method combines DEA variable weight with AHP from both optimistic and pessimistic views to obtain th...
متن کاملDetermining the Potential of Rain Water Harvesting Based on Geomorphological Factors and Analytic Hierarchy Process (Kalat Watershed, Khorasan Razavi Province)
In this research, a method is proposed to identify and determine rainwater harvesting potential in a watershed based on geomorphological factors through integrating Geographical Information System (GIS) and Analytical Hierarchy Process (AHP). For this purpose, land use, land cover, topography, geology, soil, vegetation, and soil permeability factors were considered the as main geomorphological ...
متن کامل